The specific conductance at this site is operated seasonally, April through November only.
Station operated by the U.S. Geological Survey in cooperation with United States Army.
Current shift adjusted rating
table.
What
is a shift adjusted stage-discharge rating table?
Min (2019) | 25th percen- tile | Mean | Median | Most Recent Instantaneous Value Sep 21 | 75th percen- tile | Max (2017) |
---|---|---|---|---|---|---|
0.02 | 0.04 | 0.09 | 0.09 | 0.10 | 0.13 | 0.21 |