Page Loading - Please Wait...
Operated in cooperation with the![]() Beginning Aug. 22, 2012 gage operations were transferred to a
new gage located approximately 600 feet upstream from previous
gage. Fall between these gages varies from 0.3 ft of fall at high
stages (~21 ft) to 0.6 to 0.8 ft of fall at low stages (~1.0
ft). |
Most Recent Instantaneous Value Mar 4 | Min (1959) | 25th percen- tile | Median | 75th percen- tile | Mean | Max (1983) |
---|---|---|---|---|---|---|
-- unavailable -- | 1.80 | 34 | 90 | 339 | 399 | 7510 |