Page Loading - Please Wait...
Groundwater levels for the Nation
Agency code = | usgs |
---|---|
site_no list = |
|
Minimum number of levels = | 1 |
Table of data |
Tab-separated data |
Graph of data |
Reselect period |
Date | Time |
Water-level date-time accuracy |
Parameter code | Water level, feet below land surface |
Water level, feet above specific vertical datum |
Referenced vertical datum |
Status |
Method of measurement |
Measuring agency |
Source of measurement |
Water-level approval status |
---|---|---|---|---|---|---|---|---|---|---|---|
1975-09-15 | 14:00 UTC | m | 62610 |   | 8.00 | NGVD29 | 1 | S |   |   | A |
1975-09-15 | 14:00 UTC | m | 62611 |   | 7.11 | NAVD88 | 1 | S |   |   | A |
1975-09-15 | 14:00 UTC | m | 72019 | 2.78 |   |   | 1 | S |   |   | A |
1976-05-10 | 12:40 UTC | m | 62610 |   | -1.40 | NGVD29 | 1 | S |   |   | A |
1976-05-10 | 12:40 UTC | m | 62611 |   | -2.29 | NAVD88 | 1 | S |   |   | A |
1976-05-10 | 12:40 UTC | m | 72019 | 12.18 |   |   | 1 | S |   |   | A |
1976-09-07 | 13:55 UTC | m | 62610 |   | 7.30 | NGVD29 | 1 | S |   |   | A |
1976-09-07 | 13:55 UTC | m | 62611 |   | 6.41 | NAVD88 | 1 | S |   |   | A |
1976-09-07 | 13:55 UTC | m | 72019 | 3.48 |   |   | 1 | S |   |   | A |
1978-09-25 | 18:25 UTC | m | 62610 |   | 8.29 | NGVD29 | 1 | S |   |   | A |
1978-09-25 | 18:25 UTC | m | 62611 |   | 7.40 | NAVD88 | 1 | S |   |   | A |
1978-09-25 | 18:25 UTC | m | 72019 | 2.49 |   |   | 1 | S |   |   | A |
1979-05-15 | 16:00 UTC | m | 62610 |   | 6.70 | NGVD29 | 1 | S |   |   | A |
1979-05-15 | 16:00 UTC | m | 62611 |   | 5.81 | NAVD88 | 1 | S |   |   | A |
1979-05-15 | 16:00 UTC | m | 72019 | 4.08 |   |   | 1 | S |   |   | A |
1979-09-20 | 18:00 UTC | m | 62610 |   | 9.00 | NGVD29 | 1 | S |   |   | A |
1979-09-20 | 18:00 UTC | m | 62611 |   | 8.11 | NAVD88 | 1 | S |   |   | A |
1979-09-20 | 18:00 UTC | m | 72019 | 1.78 |   |   | 1 | S |   |   | A |
1980-05-13 | 19:30 UTC | m | 62610 |   | -0.45 | NGVD29 | 1 | S |   |   | A |
1980-05-13 | 19:30 UTC | m | 62611 |   | -1.34 | NAVD88 | 1 | S |   |   | A |
1980-05-13 | 19:30 UTC | m | 72019 | 11.23 |   |   | 1 | S |   |   | A |
1980-09-17 | 15:15 UTC | m | 62610 |   | 10.31 | NGVD29 | 1 | S |   |   | A |
1980-09-17 | 15:15 UTC | m | 62611 |   | 9.42 | NAVD88 | 1 | S |   |   | A |
1980-09-17 | 15:15 UTC | m | 72019 | 0.47 |   |   | 1 | S |   |   | A |
1981-05-20 | 13:00 UTC | m | 62610 |   | -4.21 | NGVD29 | 1 | S |   |   | A |
1981-05-20 | 13:00 UTC | m | 62611 |   | -5.10 | NAVD88 | 1 | S |   |   | A |
1981-05-20 | 13:00 UTC | m | 72019 | 14.99 |   |   | 1 | S |   |   | A |
1981-09-22 | 19:00 UTC | m | 62610 |   | 10.41 | NGVD29 | 1 | S |   |   | A |
1981-09-22 | 19:00 UTC | m | 62611 |   | 9.52 | NAVD88 | 1 | S |   |   | A |
1981-09-22 | 19:00 UTC | m | 72019 | 0.37 |   |   | 1 | S |   |   | A |
1982-05-11 | 21:00 UTC | m | 62610 |   | 0.85 | NGVD29 | 1 | S |   |   | A |
1982-05-11 | 21:00 UTC | m | 62611 |   | -0.04 | NAVD88 | 1 | S |   |   | A |
1982-05-11 | 21:00 UTC | m | 72019 | 9.93 |   |   | 1 | S |   |   | A |
1982-09-14 | 16:00 UTC | m | 62610 |   | 8.10 | NGVD29 | 1 | S |   |   | A |
1982-09-14 | 16:00 UTC | m | 62611 |   | 7.21 | NAVD88 | 1 | S |   |   | A |
1982-09-14 | 16:00 UTC | m | 72019 | 2.68 |   |   | 1 | S |   |   | A |
1983-05-17 | 14:25 UTC | m | 62610 |   | 0.80 | NGVD29 | 1 | S |   |   | A |
1983-05-17 | 14:25 UTC | m | 62611 |   | -0.09 | NAVD88 | 1 | S |   |   | A |
1983-05-17 | 14:25 UTC | m | 72019 | 9.98 |   |   | 1 | S |   |   | A |
1983-09-13 | 15:30 UTC | m | 62610 |   | 9.90 | NGVD29 | 1 | S |   |   | A |
1983-09-13 | 15:30 UTC | m | 62611 |   | 9.01 | NAVD88 | 1 | S |   |   | A |
1983-09-13 | 15:30 UTC | m | 72019 | 0.88 |   |   | 1 | S |   |   | A |
1984-05-14 | 15:30 UTC | m | 62610 |   | -2.98 | NGVD29 | 1 | S |   |   | A |
1984-05-14 | 15:30 UTC | m | 62611 |   | -3.87 | NAVD88 | 1 | S |   |   | A |
1984-05-14 | 15:30 UTC | m | 72019 | 13.76 |   |   | 1 | S |   |   | A |
1984-09-11 | 18:30 UTC | m | 62610 |   | 6.54 | NGVD29 | 1 | S |   |   | A |
1984-09-11 | 18:30 UTC | m | 62611 |   | 5.65 | NAVD88 | 1 | S |   |   | A |
1984-09-11 | 18:30 UTC | m | 72019 | 4.24 |   |   | 1 | S |   |   | A |
1985-05-14 | 14:45 UTC | m | 62610 |   | -4.37 | NGVD29 | 1 | S |   |   | A |
1985-05-14 | 14:45 UTC | m | 62611 |   | -5.26 | NAVD88 | 1 | S |   |   | A |
1985-05-14 | 14:45 UTC | m | 72019 | 15.15 |   |   | 1 | S |   |   | A |
1985-09-10 | 13:30 UTC | m | 62610 |   | 8.90 | NGVD29 | 1 | S |   |   | A |
1985-09-10 | 13:30 UTC | m | 62611 |   | 8.01 | NAVD88 | 1 | S |   |   | A |
1985-09-10 | 13:30 UTC | m | 72019 | 1.88 |   |   | 1 | S |   |   | A |
1986-05-13 | 11:50 UTC | m | 62610 |   | 0.39 | NGVD29 | 1 | S |   |   | A |
1986-05-13 | 11:50 UTC | m | 62611 |   | -0.50 | NAVD88 | 1 | S |   |   | A |
1986-05-13 | 11:50 UTC | m | 72019 | 10.39 |   |   | 1 | S |   |   | A |
1986-09-16 | 14:05 UTC | m | 62610 |   | 7.70 | NGVD29 | 1 | S |   |   | A |
1986-09-16 | 14:05 UTC | m | 62611 |   | 6.81 | NAVD88 | 1 | S |   |   | A |
1986-09-16 | 14:05 UTC | m | 72019 | 3.08 |   |   | 1 | S |   |   | A |
1987-05-19 | 18:45 UTC | m | 62610 |   | 4.77 | NGVD29 | 1 | S |   |   | A |
1987-05-19 | 18:45 UTC | m | 62611 |   | 3.88 | NAVD88 | 1 | S |   |   | A |
1987-05-19 | 18:45 UTC | m | 72019 | 6.01 |   |   | 1 | S |   |   | A |
1987-09-15 | 13:15 UTC | m | 62610 |   | 8.04 | NGVD29 | 1 | S |   |   | A |
1987-09-15 | 13:15 UTC | m | 62611 |   | 7.15 | NAVD88 | 1 | S |   |   | A |
1987-09-15 | 13:15 UTC | m | 72019 | 2.74 |   |   | 1 | S |   |   | A |
1987-11-18 | 16:17 UTC | m | 62610 |   | 6.13 | NGVD29 | 1 | O | USGS | S | A |
1987-11-18 | 16:17 UTC | m | 62611 |   | 5.24 | NAVD88 | 1 | O | USGS | S | A |
1987-11-18 | 16:17 UTC | m | 72019 | 4.65 |   |   | 1 | O | USGS | S | A |
1988-09-20 | 14:35 UTC | m | 62610 |   | 9.78 | NGVD29 | 1 | S |   |   | A |
1988-09-20 | 14:35 UTC | m | 62611 |   | 8.89 | NAVD88 | 1 | S |   |   | A |
1988-09-20 | 14:35 UTC | m | 72019 | 1.00 |   |   | 1 | S |   |   | A |
1989-05-16 | 12:50 UTC | m | 62610 |   | -4.77 | NGVD29 | 1 | S |   |   | A |
1989-05-16 | 12:50 UTC | m | 62611 |   | -5.66 | NAVD88 | 1 | S |   |   | A |
1989-05-16 | 12:50 UTC | m | 72019 | 15.55 |   |   | 1 | S |   |   | A |
1989-09-11 | 21:02 UTC | m | 62610 |   | 10.43 | NGVD29 | 1 | S |   |   | A |
1989-09-11 | 21:02 UTC | m | 62611 |   | 9.54 | NAVD88 | 1 | S |   |   | A |
1989-09-11 | 21:02 UTC | m | 72019 | 0.35 |   |   | 1 | S |   |   | A |
1990-05-14 | 20:52 UTC | m | 62610 |   | -0.68 | NGVD29 | 1 | S |   |   | A |
1990-05-14 | 20:52 UTC | m | 62611 |   | -1.57 | NAVD88 | 1 | S |   |   | A |
1990-05-14 | 20:52 UTC | m | 72019 | 11.46 |   |   | 1 | S |   |   | A |
1990-09-10 | 20:51 UTC | m | 62610 |   | 9.23 | NGVD29 | 1 | S |   |   | A |
1990-09-10 | 20:51 UTC | m | 62611 |   | 8.34 | NAVD88 | 1 | S |   |   | A |
1990-09-10 | 20:51 UTC | m | 72019 | 1.55 |   |   | 1 | S |   |   | A |
1991-05-14 | 19:46 UTC | m | 62610 |   | 4.04 | NGVD29 | 1 | S |   |   | A |
1991-05-14 | 19:46 UTC | m | 62611 |   | 3.15 | NAVD88 | 1 | S |   |   | A |
1991-05-14 | 19:46 UTC | m | 72019 | 6.74 |   |   | 1 | S |   |   | A |
1991-09-10 | 18:20 UTC | m | 62610 |   | 11.23 | NGVD29 | 1 | S |   |   | A |
1991-09-10 | 18:20 UTC | m | 62611 |   | 10.34 | NAVD88 | 1 | S |   |   | A |
1991-09-10 | 18:20 UTC | m | 72019 | -0.45 |   |   | 1 | S |   |   | A |
1992-05-14 | 16:20 UTC | m | 62610 |   | 2.23 | NGVD29 | 1 | S |   |   | A |
1992-05-14 | 16:20 UTC | m | 62611 |   | 1.34 | NAVD88 | 1 | S |   |   | A |
1992-05-14 | 16:20 UTC | m | 72019 | 8.55 |   |   | 1 | S |   |   | A |
1992-09-17 | 22:35 UTC | m | 62610 |   | 11.18 | NGVD29 | 1 | S |   |   | A |
1992-09-17 | 22:35 UTC | m | 62611 |   | 10.29 | NAVD88 | 1 | S |   |   | A |
1992-09-17 | 22:35 UTC | m | 72019 | -0.40 |   |   | 1 | S |   |   | A |
1993-05-19 | 18:50 UTC | m | 62610 |   | 3.75 | NGVD29 | 1 | S |   |   | A |
1993-05-19 | 18:50 UTC | m | 62611 |   | 2.86 | NAVD88 | 1 | S |   |   | A |
1993-05-19 | 18:50 UTC | m | 72019 | 7.03 |   |   | 1 | S |   |   | A |
1993-09-16 | 17:20 UTC | m | 62610 |   | 11.78 | NGVD29 | 1 | S |   |   | A |
1993-09-16 | 17:20 UTC | m | 62611 |   | 10.89 | NAVD88 | 1 | S |   |   | A |
1993-09-16 | 17:20 UTC | m | 72019 | -1.00 |   |   | 1 | S |   |   | A |
1994-05-24 | 12:30 UTC | m | 62610 |   | 2.12 | NGVD29 | 1 | S |   |   | A |
1994-05-24 | 12:30 UTC | m | 62611 |   | 1.23 | NAVD88 | 1 | S |   |   | A |
1994-05-24 | 12:30 UTC | m | 72019 | 8.66 |   |   | 1 | S |   |   | A |
1995-05-22 | 13:50 UTC | m | 62610 |   | 2.39 | NGVD29 | 1 | S |   |   | A |
1995-05-22 | 13:50 UTC | m | 62611 |   | 1.50 | NAVD88 | 1 | S |   |   | A |
1995-05-22 | 13:50 UTC | m | 72019 | 8.39 |   |   | 1 | S |   |   | A |
1996-05-22 | 12:00 UTC | m | 62610 |   | 5.42 | NGVD29 | 1 | S |   |   | A |
1996-05-22 | 12:00 UTC | m | 62611 |   | 4.53 | NAVD88 | 1 | S |   |   | A |
1996-05-22 | 12:00 UTC | m | 72019 | 5.36 |   |   | 1 | S |   |   | A |
1996-09-09 | 13:40 UTC | m | 62610 |   | 6.94 | NGVD29 | 1 | S |   |   | A |
1996-09-09 | 13:40 UTC | m | 62611 |   | 6.05 | NAVD88 | 1 | S |   |   | A |
1996-09-09 | 13:40 UTC | m | 72019 | 3.84 |   |   | 1 | S |   |   | A |
1997-05-13 | 11:34 UTC | m | 62610 |   | 6.36 | NGVD29 | 1 | S |   |   | A |
1997-05-13 | 11:34 UTC | m | 62611 |   | 5.47 | NAVD88 | 1 | S |   |   | A |
1997-05-13 | 11:34 UTC | m | 72019 | 4.42 |   |   | 1 | S |   |   | A |
1997-09-08 | 13:52 UTC | m | 62610 |   | 9.40 | NGVD29 | 1 | S |   |   | A |
1997-09-08 | 13:52 UTC | m | 62611 |   | 8.51 | NAVD88 | 1 | S |   |   | A |
1997-09-08 | 13:52 UTC | m | 72019 | 1.38 |   |   | 1 | S |   |   | A |
Section | Code | Description |
---|---|---|
Water-level date-time accuracy | m | Date is accurate to the Minute |
Parameter code | 62610 | Groundwater level above NGVD 1929, feet |
Parameter code | 62611 | Groundwater level above NAVD 1988, feet |
Parameter code | 72019 | Depth to water level, feet below land surface |
Referenced vertical datum | NAVD88 | North American Vertical Datum of 1988 |
Referenced vertical datum | NGVD29 | National Geodetic Vertical Datum of 1929 |
Status | 1 | Static |
Method of measurement | O | Observed. |
Method of measurement | S | Steel-tape measurement. |
Measuring agency | Not determined | |
Measuring agency | USGS | U.S. Geological Survey |
Source of measurement | Not determined | |
Source of measurement | S | Measured by personnel of reporting agency. |
Water-level approval status | A | Approved for publication -- Processing and review completed. |