Page Loading - Please Wait...
Groundwater levels for the Nation
Agency code = | usgs |
---|---|
site_no list = |
|
Minimum number of levels = | 1 |
Table of data |
Tab-separated data |
Graph of data |
Reselect period |
Date | Time |
Water-level date-time accuracy |
Parameter code | Water level, feet below land surface |
Water level, feet above specific vertical datum |
Referenced vertical datum |
Status |
Method of measurement |
Measuring agency |
Source of measurement |
Water-level approval status |
---|---|---|---|---|---|---|---|---|---|---|---|
1976-05-10 | 22:10 UTC | m | 62610 |   | 3.10 | NGVD29 | 1 | S |   |   | A |
1976-05-10 | 22:10 UTC | m | 62611 |   | 2.21 | NAVD88 | 1 | S |   |   | A |
1976-05-10 | 22:10 UTC | m | 72019 | 2.90 |   |   | 1 | S |   |   | A |
1977-05-09 | 12:10 UTC | m | 62610 |   | 4.42 | NGVD29 | 1 | S |   |   | A |
1977-05-09 | 12:10 UTC | m | 62611 |   | 3.53 | NAVD88 | 1 | S |   |   | A |
1977-05-09 | 12:10 UTC | m | 72019 | 1.58 |   |   | 1 | S |   |   | A |
1977-09-21 | 20:45 UTC | m | 62610 |   | 8.20 | NGVD29 | 1 | S |   |   | A |
1977-09-21 | 20:45 UTC | m | 62611 |   | 7.31 | NAVD88 | 1 | S |   |   | A |
1977-09-21 | 20:45 UTC | m | 72019 | -2.20 |   |   | 1 | S |   |   | A |
1978-05-18 | 15:55 UTC | m | 62610 |   | 4.74 | NGVD29 | 1 | S |   |   | A |
1978-05-18 | 15:55 UTC | m | 62611 |   | 3.85 | NAVD88 | 1 | S |   |   | A |
1978-05-18 | 15:55 UTC | m | 72019 | 1.26 |   |   | 1 | S |   |   | A |
1978-09-28 | 21:15 UTC | m | 62610 |   | 1.73 | NGVD29 | 1 | S |   |   | A |
1978-09-28 | 21:15 UTC | m | 62611 |   | 0.84 | NAVD88 | 1 | S |   |   | A |
1978-09-28 | 21:15 UTC | m | 72019 | 4.27 |   |   | 1 | S |   |   | A |
1979-05-17 | 21:10 UTC | m | 62610 |   | 8.15 | NGVD29 | 1 | S |   |   | A |
1979-05-17 | 21:10 UTC | m | 62611 |   | 7.26 | NAVD88 | 1 | S |   |   | A |
1979-05-17 | 21:10 UTC | m | 72019 | -2.15 |   |   | 1 | S |   |   | A |
1979-09-18 | 20:45 UTC | m | 62610 |   | 8.20 | NGVD29 | 1 | S |   |   | A |
1979-09-18 | 20:45 UTC | m | 62611 |   | 7.31 | NAVD88 | 1 | S |   |   | A |
1979-09-18 | 20:45 UTC | m | 72019 | -2.20 |   |   | 1 | S |   |   | A |
1980-05-13 | 20:35 UTC | m | 62610 |   | 5.64 | NGVD29 | 1 | S |   |   | A |
1980-05-13 | 20:35 UTC | m | 62611 |   | 4.75 | NAVD88 | 1 | S |   |   | A |
1980-05-13 | 20:35 UTC | m | 72019 | 0.36 |   |   | 1 | S |   |   | A |
1980-09-17 | 13:00 UTC | m | 62610 |   | 7.29 | NGVD29 | 1 | S |   |   | A |
1980-09-17 | 13:00 UTC | m | 62611 |   | 6.40 | NAVD88 | 1 | S |   |   | A |
1980-09-17 | 13:00 UTC | m | 72019 | -1.29 |   |   | 1 | S |   |   | A |
1981-05-20 | 12:00 UTC | m | 62610 |   | 3.50 | NGVD29 | 1 | S |   |   | A |
1981-05-20 | 12:00 UTC | m | 62611 |   | 2.61 | NAVD88 | 1 | S |   |   | A |
1981-05-20 | 12:00 UTC | m | 72019 | 2.50 |   |   | 1 | S |   |   | A |
1981-09-23 | 18:50 UTC | m | 62610 |   | 8.10 | NGVD29 | 1 | S |   |   | A |
1981-09-23 | 18:50 UTC | m | 62611 |   | 7.21 | NAVD88 | 1 | S |   |   | A |
1981-09-23 | 18:50 UTC | m | 72019 | -2.10 |   |   | 1 | S |   |   | A |
1982-05-10 | 13:55 UTC | m | 62610 |   | 5.25 | NGVD29 | 1 | S |   |   | A |
1982-05-10 | 13:55 UTC | m | 62611 |   | 4.36 | NAVD88 | 1 | S |   |   | A |
1982-05-10 | 13:55 UTC | m | 72019 | 0.75 |   |   | 1 | S |   |   | A |
1982-09-14 | 14:35 UTC | m | 62610 |   | 7.60 | NGVD29 | 1 | S |   |   | A |
1982-09-14 | 14:35 UTC | m | 62611 |   | 6.71 | NAVD88 | 1 | S |   |   | A |
1982-09-14 | 14:35 UTC | m | 72019 | -1.60 |   |   | 1 | S |   |   | A |
Section | Code | Description |
---|---|---|
Water-level date-time accuracy | m | Date is accurate to the Minute |
Parameter code | 62610 | Groundwater level above NGVD 1929, feet |
Parameter code | 62611 | Groundwater level above NAVD 1988, feet |
Parameter code | 72019 | Depth to water level, feet below land surface |
Referenced vertical datum | NAVD88 | North American Vertical Datum of 1988 |
Referenced vertical datum | NGVD29 | National Geodetic Vertical Datum of 1929 |
Status | 1 | Static |
Method of measurement | S | Steel-tape measurement. |
Measuring agency | Not determined | |
Source of measurement | Not determined | |
Water-level approval status | A | Approved for publication -- Processing and review completed. |