Page Loading - Please Wait...
Groundwater levels for the Nation
Agency code = | usgs |
---|---|
site_no list = |
|
Minimum number of levels = | 1 |
Table of data |
Tab-separated data |
Graph of data |
Reselect period |
Date | Time |
Water-level date-time accuracy |
Parameter code | Water level, feet below land surface |
Water level, feet above specific vertical datum |
Referenced vertical datum |
Status |
Method of measurement |
Measuring agency |
Source of measurement |
Water-level approval status |
---|---|---|---|---|---|---|---|---|---|---|---|
1948-08-19 | D | 62610 |   | -72.33 | NGVD29 | 1 | L |   |   | A | |
1948-08-19 | D | 62611 |   | -72.41 | NAVD88 | 1 | L |   |   | A | |
1948-08-19 | D | 72019 | 133.00 |   |   | 1 | L |   |   | A | |
1949-11 | M | 62610 |   | -72.33 | NGVD29 | 1 | O |   |   | A | |
1949-11 | M | 62611 |   | -72.41 | NAVD88 | 1 | O |   |   | A | |
1949-11 | M | 72019 | 133.00 |   |   | 1 | O |   |   | A | |
1950-11 | M | 62610 |   | -79.33 | NGVD29 | 1 | O |   |   | A | |
1950-11 | M | 62611 |   | -79.41 | NAVD88 | 1 | O |   |   | A | |
1950-11 | M | 72019 | 140.00 |   |   | 1 | O |   |   | A | |
1951-11 | M | 62610 |   | -89.33 | NGVD29 | 1 | O |   |   | A | |
1951-11 | M | 62611 |   | -89.41 | NAVD88 | 1 | O |   |   | A | |
1951-11 | M | 72019 | 150.00 |   |   | 1 | O |   |   | A | |
1952-11 | M | 62610 |   | -111.33 | NGVD29 | 1 | O |   |   | A | |
1952-11 | M | 62611 |   | -111.41 | NAVD88 | 1 | O |   |   | A | |
1952-11 | M | 72019 | 172.00 |   |   | 1 | O |   |   | A | |
1973-02-06 | D | 62610 |   | -207.33 | NGVD29 | 1 | O |   |   | A | |
1973-02-06 | D | 62611 |   | -207.41 | NAVD88 | 1 | O |   |   | A | |
1973-02-06 | D | 72019 | 268.00 |   |   | 1 | O |   |   | A | |
1974-02-11 | D | 62610 |   | -202.33 | NGVD29 | 1 | O |   |   | A | |
1974-02-11 | D | 62611 |   | -202.41 | NAVD88 | 1 | O |   |   | A | |
1974-02-11 | D | 72019 | 263.00 |   |   | 1 | O |   |   | A | |
1974-06-01 | D | 62610 |   | -209.33 | NGVD29 | 1 | O |   |   | A | |
1974-06-01 | D | 62611 |   | -209.41 | NAVD88 | 1 | O |   |   | A | |
1974-06-01 | D | 72019 | 270.00 |   |   | 1 | O |   |   | A | |
1974-08-28 | D | 62610 |   | -220.33 | NGVD29 | 1 | O |   |   | A | |
1974-08-28 | D | 62611 |   | -220.41 | NAVD88 | 1 | O |   |   | A | |
1974-08-28 | D | 72019 | 281.00 |   |   | 1 | O |   |   | A | |
1974-10-02 | D | 62610 |   | -219.33 | NGVD29 | 1 | O |   |   | A | |
1974-10-02 | D | 62611 |   | -219.41 | NAVD88 | 1 | O |   |   | A | |
1974-10-02 | D | 72019 | 280.00 |   |   | 1 | O |   |   | A | |
1974-11-01 | D | 62610 |   | -218.33 | NGVD29 | 1 | O |   |   | A | |
1974-11-01 | D | 62611 |   | -218.41 | NAVD88 | 1 | O |   |   | A | |
1974-11-01 | D | 72019 | 279.00 |   |   | 1 | O |   |   | A | |
1974-12-02 | D | 62610 |   | -216.33 | NGVD29 | 1 | O |   |   | A | |
1974-12-02 | D | 62611 |   | -216.41 | NAVD88 | 1 | O |   |   | A | |
1974-12-02 | D | 72019 | 277.00 |   |   | 1 | O |   |   | A | |
1975-05-28 | D | 62610 |   | -210.33 | NGVD29 | 1 | O |   |   | A | |
1975-05-28 | D | 62611 |   | -210.41 | NAVD88 | 1 | O |   |   | A | |
1975-05-28 | D | 72019 | 271.00 |   |   | 1 | O |   |   | A | |
1975-06-02 | D | 62610 |   | -210.33 | NGVD29 | 1 | O |   |   | A | |
1975-06-02 | D | 62611 |   | -210.41 | NAVD88 | 1 | O |   |   | A | |
1975-06-02 | D | 72019 | 271.00 |   |   | 1 | O |   |   | A | |
1975-07-01 | D | 62610 |   | -217.33 | NGVD29 | 1 | O |   |   | A | |
1975-07-01 | D | 62611 |   | -217.41 | NAVD88 | 1 | O |   |   | A | |
1975-07-01 | D | 72019 | 278.00 |   |   | 1 | O |   |   | A | |
1975-07-23 | D | 62610 |   | -218.33 | NGVD29 | 1 | O |   |   | A | |
1975-07-23 | D | 62611 |   | -218.41 | NAVD88 | 1 | O |   |   | A | |
1975-07-23 | D | 72019 | 279.00 |   |   | 1 | O |   |   | A | |
1975-09-18 | D | 62610 |   | -211.33 | NGVD29 | 1 | O |   |   | A | |
1975-09-18 | D | 62611 |   | -211.41 | NAVD88 | 1 | O |   |   | A | |
1975-09-18 | D | 72019 | 272.00 |   |   | 1 | O |   |   | A | |
1975-10-28 | D | 62610 |   | -211.33 | NGVD29 | 1 | O |   |   | A | |
1975-10-28 | D | 62611 |   | -211.41 | NAVD88 | 1 | O |   |   | A | |
1975-10-28 | D | 72019 | 272.00 |   |   | 1 | O |   |   | A | |
1975-12-02 | D | 62610 |   | -215.33 | NGVD29 | 1 | O |   |   | A | |
1975-12-02 | D | 62611 |   | -215.41 | NAVD88 | 1 | O |   |   | A | |
1975-12-02 | D | 72019 | 276.00 |   |   | 1 | O |   |   | A | |
1976-01-01 | D | 62610 |   | -214.33 | NGVD29 | 1 | O |   |   | A | |
1976-01-01 | D | 62611 |   | -214.41 | NAVD88 | 1 | O |   |   | A | |
1976-01-01 | D | 72019 | 275.00 |   |   | 1 | O |   |   | A | |
1976-02-03 | D | 62610 |   | -213.33 | NGVD29 | 1 | O |   |   | A | |
1976-02-03 | D | 62611 |   | -213.41 | NAVD88 | 1 | O |   |   | A | |
1976-02-03 | D | 72019 | 274.00 |   |   | 1 | O |   |   | A | |
1976-03-02 | D | 62610 |   | -217.33 | NGVD29 | 1 | O |   |   | A | |
1976-03-02 | D | 62611 |   | -217.41 | NAVD88 | 1 | O |   |   | A | |
1976-03-02 | D | 72019 | 278.00 |   |   | 1 | O |   |   | A | |
1976-03-30 | D | 62610 |   | -213.33 | NGVD29 | 1 | O |   |   | A | |
1976-03-30 | D | 62611 |   | -213.41 | NAVD88 | 1 | O |   |   | A | |
1976-03-30 | D | 72019 | 274.00 |   |   | 1 | O |   |   | A | |
1976-04-28 | D | 62610 |   | -211.33 | NGVD29 | 1 | O |   |   | A | |
1976-04-28 | D | 62611 |   | -211.41 | NAVD88 | 1 | O |   |   | A | |
1976-04-28 | D | 72019 | 272.00 |   |   | 1 | O |   |   | A | |
1976-05-27 | D | 62610 |   | -213.33 | NGVD29 | 1 | O |   |   | A | |
1976-05-27 | D | 62611 |   | -213.41 | NAVD88 | 1 | O |   |   | A | |
1976-05-27 | D | 72019 | 274.00 |   |   | 1 | O |   |   | A | |
1976-06-28 | D | 62610 |   | -210.33 | NGVD29 | 1 | O |   |   | A | |
1976-06-28 | D | 62611 |   | -210.41 | NAVD88 | 1 | O |   |   | A | |
1976-06-28 | D | 72019 | 271.00 |   |   | 1 | O |   |   | A | |
1976-07-29 | D | 62610 |   | -217.33 | NGVD29 | 1 | O |   |   | A | |
1976-07-29 | D | 62611 |   | -217.41 | NAVD88 | 1 | O |   |   | A | |
1976-07-29 | D | 72019 | 278.00 |   |   | 1 | O |   |   | A | |
1976-08-29 | D | 62610 |   | -224.33 | NGVD29 | 1 | O |   |   | A | |
1976-08-29 | D | 62611 |   | -224.41 | NAVD88 | 1 | O |   |   | A | |
1976-08-29 | D | 72019 | 285.00 |   |   | 1 | O |   |   | A | |
1976-09-28 | D | 62610 |   | -224.33 | NGVD29 | 1 | O |   |   | A | |
1976-09-28 | D | 62611 |   | -224.41 | NAVD88 | 1 | O |   |   | A | |
1976-09-28 | D | 72019 | 285.00 |   |   | 1 | O |   |   | A | |
1976-10-27 | D | 62610 |   | -219.33 | NGVD29 | 1 | O |   |   | A | |
1976-10-27 | D | 62611 |   | -219.41 | NAVD88 | 1 | O |   |   | A | |
1976-10-27 | D | 72019 | 280.00 |   |   | 1 | O |   |   | A | |
1976-12-03 | D | 62610 |   | -219.33 | NGVD29 | 1 | O |   |   | A | |
1976-12-03 | D | 62611 |   | -219.41 | NAVD88 | 1 | O |   |   | A | |
1976-12-03 | D | 72019 | 280.00 |   |   | 1 | O |   |   | A | |
1976-12-29 | D | 62610 |   | -221.33 | NGVD29 | 1 | O |   |   | A | |
1976-12-29 | D | 62611 |   | -221.41 | NAVD88 | 1 | O |   |   | A | |
1976-12-29 | D | 72019 | 282.00 |   |   | 1 | O |   |   | A | |
1977-01-26 | D | 62610 |   | -222.33 | NGVD29 | 1 | O |   |   | A | |
1977-01-26 | D | 62611 |   | -222.41 | NAVD88 | 1 | O |   |   | A | |
1977-01-26 | D | 72019 | 283.00 |   |   | 1 | O |   |   | A | |
1977-02-01 | D | 62610 |   | -222.33 | NGVD29 | 1 | O |   |   | A | |
1977-02-01 | D | 62611 |   | -222.41 | NAVD88 | 1 | O |   |   | A | |
1977-02-01 | D | 72019 | 283.00 |   |   | 1 | O |   |   | A | |
1977-03-01 | D | 62610 |   | -217.33 | NGVD29 | 1 | O |   |   | A | |
1977-03-01 | D | 62611 |   | -217.41 | NAVD88 | 1 | O |   |   | A | |
1977-03-01 | D | 72019 | 278.00 |   |   | 1 | O |   |   | A | |
1977-04-01 | D | 62610 |   | -221.33 | NGVD29 | 1 | O |   |   | A | |
1977-04-01 | D | 62611 |   | -221.41 | NAVD88 | 1 | O |   |   | A | |
1977-04-01 | D | 72019 | 282.00 |   |   | 1 | O |   |   | A | |
1977-05-01 | D | 62610 |   | -219.33 | NGVD29 | 1 | O |   |   | A | |
1977-05-01 | D | 62611 |   | -219.41 | NAVD88 | 1 | O |   |   | A | |
1977-05-01 | D | 72019 | 280.00 |   |   | 1 | O |   |   | A | |
1978-01-06 | D | 62610 |   | -245.33 | NGVD29 | 1 | O |   |   | A | |
1978-01-06 | D | 62611 |   | -245.41 | NAVD88 | 1 | O |   |   | A | |
1978-01-06 | D | 72019 | 306.00 |   |   | 1 | O |   |   | A | |
1978-02-01 | D | 62610 |   | -222.33 | NGVD29 | 1 | O |   |   | A | |
1978-02-01 | D | 62611 |   | -222.41 | NAVD88 | 1 | O |   |   | A | |
1978-02-01 | D | 72019 | 283.00 |   |   | 1 | O |   |   | A | |
1978-03-28 | D | 62610 |   | -234.33 | NGVD29 | 1 | O |   |   | A | |
1978-03-28 | D | 62611 |   | -234.41 | NAVD88 | 1 | O |   |   | A | |
1978-03-28 | D | 72019 | 295.00 |   |   | 1 | O |   |   | A | |
1978-05-04 | D | 62610 |   | -234.33 | NGVD29 | 1 | O |   |   | A | |
1978-05-04 | D | 62611 |   | -234.41 | NAVD88 | 1 | O |   |   | A | |
1978-05-04 | D | 72019 | 295.00 |   |   | 1 | O |   |   | A | |
1978-06-01 | D | 62610 |   | -243.33 | NGVD29 | 1 | O |   |   | A | |
1978-06-01 | D | 62611 |   | -243.41 | NAVD88 | 1 | O |   |   | A | |
1978-06-01 | D | 72019 | 304.00 |   |   | 1 | O |   |   | A | |
1978-07-01 | D | 62610 |   | -249.33 | NGVD29 | 1 | O |   |   | A | |
1978-07-01 | D | 62611 |   | -249.41 | NAVD88 | 1 | O |   |   | A | |
1978-07-01 | D | 72019 | 310.00 |   |   | 1 | O |   |   | A | |
1978-08-01 | D | 62610 |   | -231.33 | NGVD29 | 1 | O |   |   | A | |
1978-08-01 | D | 62611 |   | -231.41 | NAVD88 | 1 | O |   |   | A | |
1978-08-01 | D | 72019 | 292.00 |   |   | 1 | O |   |   | A | |
1978-09-01 | D | 62610 |   | -259.33 | NGVD29 | 1 | O |   |   | A | |
1978-09-01 | D | 62611 |   | -259.41 | NAVD88 | 1 | O |   |   | A | |
1978-09-01 | D | 72019 | 320.00 |   |   | 1 | O |   |   | A | |
1978-10-01 | D | 62610 |   | -255.33 | NGVD29 | 1 | O |   |   | A | |
1978-10-01 | D | 62611 |   | -255.41 | NAVD88 | 1 | O |   |   | A | |
1978-10-01 | D | 72019 | 316.00 |   |   | 1 | O |   |   | A | |
1978-11-02 | D | 62610 |   | -259.33 | NGVD29 | 1 | O |   |   | A | |
1978-11-02 | D | 62611 |   | -259.41 | NAVD88 | 1 | O |   |   | A | |
1978-11-02 | D | 72019 | 320.00 |   |   | 1 | O |   |   | A | |
1978-12-11 | D | 62610 |   | -258.33 | NGVD29 | 1 | O |   |   | A | |
1978-12-11 | D | 62611 |   | -258.41 | NAVD88 | 1 | O |   |   | A | |
1978-12-11 | D | 72019 | 319.00 |   |   | 1 | O |   |   | A | |
1979-01-22 | D | 62610 |   | -252.33 | NGVD29 | 1 | O |   |   | A | |
1979-01-22 | D | 62611 |   | -252.41 | NAVD88 | 1 | O |   |   | A | |
1979-01-22 | D | 72019 | 313.00 |   |   | 1 | O |   |   | A | |
1979-05-10 | D | 62610 |   | -244.33 | NGVD29 | 1 | O |   |   | A | |
1979-05-10 | D | 62611 |   | -244.41 | NAVD88 | 1 | O |   |   | A | |
1979-05-10 | D | 72019 | 305.00 |   |   | 1 | O |   |   | A | |
1979-06-12 | D | 62610 |   | -244.33 | NGVD29 | 1 | O |   |   | A | |
1979-06-12 | D | 62611 |   | -244.41 | NAVD88 | 1 | O |   |   | A | |
1979-06-12 | D | 72019 | 305.00 |   |   | 1 | O |   |   | A | |
1979-07-25 | D | 62610 |   | -261.33 | NGVD29 | 1 | O |   |   | A | |
1979-07-25 | D | 62611 |   | -261.41 | NAVD88 | 1 | O |   |   | A | |
1979-07-25 | D | 72019 | 322.00 |   |   | 1 | O |   |   | A | |
1979-08-31 | D | 62610 |   | -245.33 | NGVD29 | 1 | O |   |   | A | |
1979-08-31 | D | 62611 |   | -245.41 | NAVD88 | 1 | O |   |   | A | |
1979-08-31 | D | 72019 | 306.00 |   |   | 1 | O |   |   | A | |
1979-11-01 | D | 62610 |   | -249.33 | NGVD29 | 1 | O |   |   | A | |
1979-11-01 | D | 62611 |   | -249.41 | NAVD88 | 1 | O |   |   | A | |
1979-11-01 | D | 72019 | 310.00 |   |   | 1 | O |   |   | A | |
1979-12-03 | D | 62610 |   | -243.33 | NGVD29 | 1 | O |   |   | A | |
1979-12-03 | D | 62611 |   | -243.41 | NAVD88 | 1 | O |   |   | A | |
1979-12-03 | D | 72019 | 304.00 |   |   | 1 | O |   |   | A | |
1980-01-03 | D | 62610 |   | -241.33 | NGVD29 | 1 | O |   |   | A | |
1980-01-03 | D | 62611 |   | -241.41 | NAVD88 | 1 | O |   |   | A | |
1980-01-03 | D | 72019 | 302.00 |   |   | 1 | O |   |   | A | |
1980-01-25 | D | 62610 |   | -239.33 | NGVD29 | 1 | O |   |   | A | |
1980-01-25 | D | 62611 |   | -239.41 | NAVD88 | 1 | O |   |   | A | |
1980-01-25 | D | 72019 | 300.00 |   |   | 1 | O |   |   | A | |
1980-12-08 | D | 62610 |   | -260.33 | NGVD29 | 1 | O |   |   | A | |
1980-12-08 | D | 62611 |   | -260.41 | NAVD88 | 1 | O |   |   | A | |
1980-12-08 | D | 72019 | 321.00 |   |   | 1 | O |   |   | A | |
1981-01-12 | D | 62610 |   | -256.33 | NGVD29 | 1 | O |   |   | A | |
1981-01-12 | D | 62611 |   | -256.41 | NAVD88 | 1 | O |   |   | A | |
1981-01-12 | D | 72019 | 317.00 |   |   | 1 | O |   |   | A | |
1981-02-10 | D | 62610 |   | -253.33 | NGVD29 | 1 | O |   |   | A | |
1981-02-10 | D | 62611 |   | -253.41 | NAVD88 | 1 | O |   |   | A | |
1981-02-10 | D | 72019 | 314.00 |   |   | 1 | O |   |   | A | |
1981-03-05 | D | 62610 |   | -252.33 | NGVD29 | 1 | O |   |   | A | |
1981-03-05 | D | 62611 |   | -252.41 | NAVD88 | 1 | O |   |   | A | |
1981-03-05 | D | 72019 | 313.00 |   |   | 1 | O |   |   | A | |
1981-04-03 | D | 62610 |   | -252.33 | NGVD29 | 1 | O |   |   | A | |
1981-04-03 | D | 62611 |   | -252.41 | NAVD88 | 1 | O |   |   | A | |
1981-04-03 | D | 72019 | 313.00 |   |   | 1 | O |   |   | A | |
1981-05-04 | D | 62610 |   | -252.33 | NGVD29 | 1 | O |   |   | A | |
1981-05-04 | D | 62611 |   | -252.41 | NAVD88 | 1 | O |   |   | A | |
1981-05-04 | D | 72019 | 313.00 |   |   | 1 | O |   |   | A | |
1981-06-15 | D | 62610 |   | -254.33 | NGVD29 | 1 | O |   |   | A | |
1981-06-15 | D | 62611 |   | -254.41 | NAVD88 | 1 | O |   |   | A | |
1981-06-15 | D | 72019 | 315.00 |   |   | 1 | O |   |   | A | |
1981-07-28 | D | 62610 |   | -256.33 | NGVD29 | 1 | O |   |   | A | |
1981-07-28 | D | 62611 |   | -256.41 | NAVD88 | 1 | O |   |   | A | |
1981-07-28 | D | 72019 | 317.00 |   |   | 1 | O |   |   | A | |
1981-08-25 | D | 62610 |   | -257.33 | NGVD29 | 1 | O |   |   | A | |
1981-08-25 | D | 62611 |   | -257.41 | NAVD88 | 1 | O |   |   | A | |
1981-08-25 | D | 72019 | 318.00 |   |   | 1 | O |   |   | A | |
1981-09-23 | D | 62610 |   | -260.33 | NGVD29 | 1 | O |   |   | A | |
1981-09-23 | D | 62611 |   | -260.41 | NAVD88 | 1 | O |   |   | A | |
1981-09-23 | D | 72019 | 321.00 |   |   | 1 | O |   |   | A | |
1981-10-28 | D | 62610 |   | -258.33 | NGVD29 | 1 | O |   |   | A | |
1981-10-28 | D | 62611 |   | -258.41 | NAVD88 | 1 | O |   |   | A | |
1981-10-28 | D | 72019 | 319.00 |   |   | 1 | O |   |   | A | |
1981-11-17 | D | 62610 |   | -254.33 | NGVD29 | 1 | O |   |   | A | |
1981-11-17 | D | 62611 |   | -254.41 | NAVD88 | 1 | O |   |   | A | |
1981-11-17 | D | 72019 | 315.00 |   |   | 1 | O |   |   | A | |
1981-12-11 | D | 62610 |   | -250.33 | NGVD29 | 1 | O |   |   | A | |
1981-12-11 | D | 62611 |   | -250.41 | NAVD88 | 1 | O |   |   | A | |
1981-12-11 | D | 72019 | 311.00 |   |   | 1 | O |   |   | A | |
1982-01-22 | D | 62610 |   | -255.33 | NGVD29 | 1 | O |   |   | A | |
1982-01-22 | D | 62611 |   | -255.41 | NAVD88 | 1 | O |   |   | A | |
1982-01-22 | D | 72019 | 316.00 |   |   | 1 | O |   |   | A | |
1982-02-28 | D | 62610 |   | -251.33 | NGVD29 | 1 | O |   |   | A | |
1982-02-28 | D | 62611 |   | -251.41 | NAVD88 | 1 | O |   |   | A | |
1982-02-28 | D | 72019 | 312.00 |   |   | 1 | O |   |   | A | |
1982-03-31 | D | 62610 |   | -251.33 | NGVD29 | 1 | O |   |   | A | |
1982-03-31 | D | 62611 |   | -251.41 | NAVD88 | 1 | O |   |   | A | |
1982-03-31 | D | 72019 | 312.00 |   |   | 1 | O |   |   | A | |
1982-04-28 | D | 62610 |   | -247.33 | NGVD29 | 1 | O |   |   | A | |
1982-04-28 | D | 62611 |   | -247.41 | NAVD88 | 1 | O |   |   | A | |
1982-04-28 | D | 72019 | 308.00 |   |   | 1 | O |   |   | A | |
1982-05-26 | D | 62610 |   | -249.33 | NGVD29 | 1 | O |   |   | A | |
1982-05-26 | D | 62611 |   | -249.41 | NAVD88 | 1 | O |   |   | A | |
1982-05-26 | D | 72019 | 310.00 |   |   | 1 | O |   |   | A | |
1982-06-30 | D | 62610 |   | -259.33 | NGVD29 | 1 | O |   |   | A | |
1982-06-30 | D | 62611 |   | -259.41 | NAVD88 | 1 | O |   |   | A | |
1982-06-30 | D | 72019 | 320.00 |   |   | 1 | O |   |   | A | |
1982-07-30 | D | 62610 |   | -261.33 | NGVD29 | 1 | O |   |   | A | |
1982-07-30 | D | 62611 |   | -261.41 | NAVD88 | 1 | O |   |   | A | |
1982-07-30 | D | 72019 | 322.00 |   |   | 1 | O |   |   | A | |
1982-10-31 | D | 62610 |   | -269.33 | NGVD29 | 1 | O |   |   | A | |
1982-10-31 | D | 62611 |   | -269.41 | NAVD88 | 1 | O |   |   | A | |
1982-10-31 | D | 72019 | 330.00 |   |   | 1 | O |   |   | A | |
1982-11-30 | D | 62610 |   | -268.33 | NGVD29 | 1 | O |   |   | A | |
1982-11-30 | D | 62611 |   | -268.41 | NAVD88 | 1 | O |   |   | A | |
1982-11-30 | D | 72019 | 329.00 |   |   | 1 | O |   |   | A | |
1982-12-16 | D | 62610 |   | -264.33 | NGVD29 | 1 | O |   |   | A | |
1982-12-16 | D | 62611 |   | -264.41 | NAVD88 | 1 | O |   |   | A | |
1982-12-16 | D | 72019 | 325.00 |   |   | 1 | O |   |   | A | |
1983-01-25 | D | 62610 |   | -260.33 | NGVD29 | 1 | O |   |   | A | |
1983-01-25 | D | 62611 |   | -260.41 | NAVD88 | 1 | O |   |   | A | |
1983-01-25 | D | 72019 | 321.00 |   |   | 1 | O |   |   | A | |
1983-03-09 | D | 62610 |   | -250.33 | NGVD29 | 1 | O |   |   | A | |
1983-03-09 | D | 62611 |   | -250.41 | NAVD88 | 1 | O |   |   | A | |
1983-03-09 | D | 72019 | 311.00 |   |   | 1 | O |   |   | A | |
1983-03-31 | D | 62610 |   | -253.33 | NGVD29 | 1 | O |   |   | A | |
1983-03-31 | D | 62611 |   | -253.41 | NAVD88 | 1 | O |   |   | A | |
1983-03-31 | D | 72019 | 314.00 |   |   | 1 | O |   |   | A | |
1983-05-12 | D | 62610 |   | -246.33 | NGVD29 | 1 | O |   |   | A | |
1983-05-12 | D | 62611 |   | -246.41 | NAVD88 | 1 | O |   |   | A | |
1983-05-12 | D | 72019 | 307.00 |   |   | 1 | O |   |   | A | |
1983-05-31 | D | 62610 |   | -245.33 | NGVD29 | 1 | O |   |   | A | |
1983-05-31 | D | 62611 |   | -245.41 | NAVD88 | 1 | O |   |   | A | |
1983-05-31 | D | 72019 | 306.00 |   |   | 1 | O |   |   | A | |
1983-06-30 | D | 62610 |   | -249.33 | NGVD29 | 1 | O |   |   | A | |
1983-06-30 | D | 62611 |   | -249.41 | NAVD88 | 1 | O |   |   | A | |
1983-06-30 | D | 72019 | 310.00 |   |   | 1 | O |   |   | A | |
1983-07 | M | 62610 |   | -251.33 | NGVD29 | 1 | O |   |   | A | |
1983-07 | M | 62611 |   | -251.41 | NAVD88 | 1 | O |   |   | A | |
1983-07 | M | 72019 | 312.00 |   |   | 1 | O |   |   | A | |
1983-10-11 | D | 62610 |   | -248.33 | NGVD29 | 1 | O |   |   | A | |
1983-10-11 | D | 62611 |   | -248.41 | NAVD88 | 1 | O |   |   | A | |
1983-10-11 | D | 72019 | 309.00 |   |   | 1 | O |   |   | A | |
1983-11-02 | D | 62610 |   | -246.33 | NGVD29 | 1 | O |   |   | A | |
1983-11-02 | D | 62611 |   | -246.41 | NAVD88 | 1 | O |   |   | A | |
1983-11-02 | D | 72019 | 307.00 |   |   | 1 | O |   |   | A | |
1983-12-01 | D | 62610 |   | -244.33 | NGVD29 | 1 | O |   |   | A | |
1983-12-01 | D | 62611 |   | -244.41 | NAVD88 | 1 | O |   |   | A | |
1983-12-01 | D | 72019 | 305.00 |   |   | 1 | O |   |   | A | |
1984-01-10 | D | 62610 |   | -249.33 | NGVD29 | 1 | O |   |   | A | |
1984-01-10 | D | 62611 |   | -249.41 | NAVD88 | 1 | O |   |   | A | |
1984-01-10 | D | 72019 | 310.00 |   |   | 1 | O |   |   | A | |
1984-02-01 | D | 62610 |   | -249.33 | NGVD29 | 1 | O |   |   | A | |
1984-02-01 | D | 62611 |   | -249.41 | NAVD88 | 1 | O |   |   | A | |
1984-02-01 | D | 72019 | 310.00 |   |   | 1 | O |   |   | A | |
1984-03-08 | D | 62610 |   | -246.33 | NGVD29 | 1 | O |   |   | A | |
1984-03-08 | D | 62611 |   | -246.41 | NAVD88 | 1 | O |   |   | A | |
1984-03-08 | D | 72019 | 307.00 |   |   | 1 | O |   |   | A | |
1984-04-01 | D | 62610 |   | -239.33 | NGVD29 | 1 | O |   |   | A | |
1984-04-01 | D | 62611 |   | -239.41 | NAVD88 | 1 | O |   |   | A | |
1984-04-01 | D | 72019 | 300.00 |   |   | 1 | O |   |   | A | |
1984-05-01 | D | 62610 |   | -244.33 | NGVD29 | 1 | O |   |   | A | |
1984-05-01 | D | 62611 |   | -244.41 | NAVD88 | 1 | O |   |   | A | |
1984-05-01 | D | 72019 | 305.00 |   |   | 1 | O |   |   | A | |
1984-06-06 | D | 62610 |   | -248.33 | NGVD29 | 1 | O |   |   | A | |
1984-06-06 | D | 62611 |   | -248.41 | NAVD88 | 1 | O |   |   | A | |
1984-06-06 | D | 72019 | 309.00 |   |   | 1 | O |   |   | A | |
1984-07-16 | D | 62610 |   | -253.33 | NGVD29 | 1 | O |   |   | A | |
1984-07-16 | D | 62611 |   | -253.41 | NAVD88 | 1 | O |   |   | A | |
1984-07-16 | D | 72019 | 314.00 |   |   | 1 | O |   |   | A | |
1984-08-15 | D | 62610 |   | -255.33 | NGVD29 | 1 | O |   |   | A | |
1984-08-15 | D | 62611 |   | -255.41 | NAVD88 | 1 | O |   |   | A | |
1984-08-15 | D | 72019 | 316.00 |   |   | 1 | O |   |   | A | |
1984-09-28 | D | 62610 |   | -254.33 | NGVD29 | 1 | O |   |   | A | |
1984-09-28 | D | 62611 |   | -254.41 | NAVD88 | 1 | O |   |   | A | |
1984-09-28 | D | 72019 | 315.00 |   |   | 1 | O |   |   | A | |
1984-10-17 | D | 62610 |   | -259.33 | NGVD29 | 1 | O |   |   | A | |
1984-10-17 | D | 62611 |   | -259.41 | NAVD88 | 1 | O |   |   | A | |
1984-10-17 | D | 72019 | 320.00 |   |   | 1 | O |   |   | A | |
1984-11-07 | D | 62610 |   | -266.33 | NGVD29 | 1 | O |   |   | A | |
1984-11-07 | D | 62611 |   | -266.41 | NAVD88 | 1 | O |   |   | A | |
1984-11-07 | D | 72019 | 327.00 |   |   | 1 | O |   |   | A | |
1984-12-12 | D | 62610 |   | -252.33 | NGVD29 | 1 | O |   |   | A | |
1984-12-12 | D | 62611 |   | -252.41 | NAVD88 | 1 | O |   |   | A | |
1984-12-12 | D | 72019 | 313.00 |   |   | 1 | O |   |   | A | |
1985-01-08 | D | 62610 |   | -249.33 | NGVD29 | 1 | O |   |   | A | |
1985-01-08 | D | 62611 |   | -249.41 | NAVD88 | 1 | O |   |   | A | |
1985-01-08 | D | 72019 | 310.00 |   |   | 1 | O |   |   | A | |
1985-01-29 | D | 62610 |   | -247.33 | NGVD29 | 1 | O |   |   | A | |
1985-01-29 | D | 62611 |   | -247.41 | NAVD88 | 1 | O |   |   | A | |
1985-01-29 | D | 72019 | 308.00 |   |   | 1 | O |   |   | A | |
1985-03-01 | D | 62610 |   | -244.33 | NGVD29 | 1 | O |   |   | A | |
1985-03-01 | D | 62611 |   | -244.41 | NAVD88 | 1 | O |   |   | A | |
1985-03-01 | D | 72019 | 305.00 |   |   | 1 | O |   |   | A | |
1985-04-02 | D | 62610 |   | -244.33 | NGVD29 | 1 | O |   |   | A | |
1985-04-02 | D | 62611 |   | -244.41 | NAVD88 | 1 | O |   |   | A | |
1985-04-02 | D | 72019 | 305.00 |   |   | 1 | O |   |   | A | |
1985-04-29 | D | 62610 |   | -244.33 | NGVD29 | 1 | O |   |   | A | |
1985-04-29 | D | 62611 |   | -244.41 | NAVD88 | 1 | O |   |   | A | |
1985-04-29 | D | 72019 | 305.00 |   |   | 1 | O |   |   | A | |
1985-05-25 | D | 62610 |   | -246.33 | NGVD29 | 1 | O |   |   | A | |
1985-05-25 | D | 62611 |   | -246.41 | NAVD88 | 1 | O |   |   | A | |
1985-05-25 | D | 72019 | 307.00 |   |   | 1 | O |   |   | A | |
1985-07-02 | D | 62610 |   | -252.33 | NGVD29 | 1 | O |   |   | A | |
1985-07-02 | D | 62611 |   | -252.41 | NAVD88 | 1 | O |   |   | A | |
1985-07-02 | D | 72019 | 313.00 |   |   | 1 | O |   |   | A | |
1985-08-01 | D | 62610 |   | -244.33 | NGVD29 | 1 | O |   |   | A | |
1985-08-01 | D | 62611 |   | -244.41 | NAVD88 | 1 | O |   |   | A | |
1985-08-01 | D | 72019 | 305.00 |   |   | 1 | O |   |   | A | |
1987-01-10 | D | 62610 |   | -238.33 | NGVD29 | 1 | O |   |   | A | |
1987-01-10 | D | 62611 |   | -238.41 | NAVD88 | 1 | O |   |   | A | |
1987-01-10 | D | 72019 | 299.00 |   |   | 1 | O |   |   | A | |
1987-04-07 | D | 62610 |   | -226.33 | NGVD29 | P | A | USGS | S | A | |
1987-04-07 | D | 62611 |   | -226.41 | NAVD88 | P | A | USGS | S | A | |
1987-04-07 | D | 72019 | 287.00 |   |   | P | A | USGS | S | A | |
1988-01-28 | D | 62610 |   | -245.33 | NGVD29 | 1 | O |   |   | A | |
1988-01-28 | D | 62611 |   | -245.41 | NAVD88 | 1 | O |   |   | A | |
1988-01-28 | D | 72019 | 306.00 |   |   | 1 | O |   |   | A | |
1988-06-22 | D | 62610 |   | -353.33 | NGVD29 | 1 | O |   |   | A | |
1988-06-22 | D | 62611 |   | -353.41 | NAVD88 | 1 | O |   |   | A | |
1988-06-22 | D | 72019 | 414.00 |   |   | 1 | O |   |   | A | |
1989-02-10 | D | 62610 |   | -242.33 | NGVD29 | P | A | USGS | S | A | |
1989-02-10 | D | 62611 |   | -242.41 | NAVD88 | P | A | USGS | S | A | |
1989-02-10 | D | 72019 | 303.00 |   |   | P | A | USGS | S | A | |
1990-01-24 | D | 62610 |   | -247.33 | NGVD29 | P | O |   |   | A | |
1990-01-24 | D | 62611 |   | -247.41 | NAVD88 | P | O |   |   | A | |
1990-01-24 | D | 72019 | 308.00 |   |   | P | O |   |   | A | |
1991-02-01 | D | 62610 |   | -251.33 | NGVD29 | P | O |   |   | A | |
1991-02-01 | D | 62611 |   | -251.41 | NAVD88 | P | O |   |   | A | |
1991-02-01 | D | 72019 | 312.00 |   |   | P | O |   |   | A | |
1991-12-27 | D | 62610 |   | -245.33 | NGVD29 | P | O |   |   | A | |
1991-12-27 | D | 62611 |   | -245.41 | NAVD88 | P | O |   |   | A | |
1991-12-27 | D | 72019 | 306.00 |   |   | P | O |   |   | A | |
1993-01-04 | D | 62610 |   | -225.33 | NGVD29 | 1 | O |   |   | A | |
1993-01-04 | D | 62611 |   | -225.41 | NAVD88 | 1 | O |   |   | A | |
1993-01-04 | D | 72019 | 286.00 |   |   | 1 | O |   |   | A | |
1995-01-31 | D | 62610 |   | -203.73 | NGVD29 | 1 | O |   |   | A | |
1995-01-31 | D | 62611 |   | -203.81 | NAVD88 | 1 | O |   |   | A | |
1995-01-31 | D | 72019 | 264.40 |   |   | 1 | O |   |   | A | |
1996-01-10 | D | 62610 |   | -190.33 | NGVD29 | 1 | O |   |   | A | |
1996-01-10 | D | 62611 |   | -190.41 | NAVD88 | 1 | O |   |   | A | |
1996-01-10 | D | 72019 | 251.00 |   |   | 1 | O |   |   | A | |
1996-12-03 | D | 62610 |   | -198.33 | NGVD29 | 1 | O |   |   | A | |
1996-12-03 | D | 62611 |   | -198.41 | NAVD88 | 1 | O |   |   | A | |
1996-12-03 | D | 72019 | 259.00 |   |   | 1 | O |   |   | A | |
1998-01-12 | D | 62610 |   | -178.33 | NGVD29 | 1 | O |   |   | A | |
1998-01-12 | D | 62611 |   | -178.41 | NAVD88 | 1 | O |   |   | A | |
1998-01-12 | D | 72019 | 239.00 |   |   | 1 | O |   |   | A | |
2001-01-24 | D | 62610 |   | -199.33 | NGVD29 | 1 | O |   |   | A | |
2001-01-24 | D | 62611 |   | -199.41 | NAVD88 | 1 | O |   |   | A | |
2001-01-24 | D | 72019 | 260.00 |   |   | 1 | O |   |   | A | |
2002-01-28 | D | 62610 |   | -194.33 | NGVD29 | 1 | O |   |   | A | |
2002-01-28 | D | 62611 |   | -194.41 | NAVD88 | 1 | O |   |   | A | |
2002-01-28 | D | 72019 | 255.00 |   |   | 1 | O |   |   | A | |
2005-03-10 | 06:01 UTC | m | 62610 |   | -183.23 | NGVD29 | P | O | USGS | S | A |
2005-03-10 | 06:01 UTC | m | 62611 |   | -183.31 | NAVD88 | P | O | USGS | S | A |
2005-03-10 | 06:01 UTC | m | 72019 | 243.90 |   |   | P | O | USGS | S | A |
2006-02-16 | 06:00 UTC | m | 62610 |   | -192.33 | NGVD29 | 1 | S | USGS | S | A |
2006-02-16 | 06:00 UTC | m | 62611 |   | -192.41 | NAVD88 | 1 | S | USGS | S | A |
2006-02-16 | 06:00 UTC | m | 72019 | 253.00 |   |   | 1 | S | USGS | S | A |
2007-02-06 | 06:01 UTC | m | 62610 |   | -167.33 | NGVD29 | P | O |   |   | A |
2007-02-06 | 06:01 UTC | m | 62611 |   | -167.41 | NAVD88 | P | O |   |   | A |
2007-02-06 | 06:01 UTC | m | 72019 | 228.00 |   |   | P | O |   |   | A |
Section | Code | Description |
---|---|---|
Water-level date-time accuracy | D | Date is accurate to the Day |
Water-level date-time accuracy | M | Date is accurate to the Month |
Water-level date-time accuracy | m | Date is accurate to the Minute |
Parameter code | 62610 | Groundwater level above NGVD 1929, feet |
Parameter code | 62611 | Groundwater level above NAVD 1988, feet |
Parameter code | 72019 | Depth to water level, feet below land surface |
Referenced vertical datum | NAVD88 | North American Vertical Datum of 1988 |
Referenced vertical datum | NGVD29 | National Geodetic Vertical Datum of 1929 |
Status | 1 | Static |
Status | P | Pumping |
Method of measurement | A | Airline measurement. |
Method of measurement | L | Interpreted from geophysical logs. |
Method of measurement | O | Observed. |
Method of measurement | S | Steel-tape measurement. |
Measuring agency | Not determined | |
Measuring agency | USGS | U.S. Geological Survey |
Source of measurement | Not determined | |
Source of measurement | S | Measured by personnel of reporting agency. |
Water-level approval status | A | Approved for publication -- Processing and review completed. |