Page Loading - Please Wait...
Groundwater levels for the Nation
Agency code = | usgs |
---|---|
site_no list = |
|
Minimum number of levels = | 1 |
Table of data |
Tab-separated data |
Graph of data |
Reselect period |
Date | Time |
Water-level date-time accuracy |
Parameter code | Water level, feet below land surface |
Water level, feet above specific vertical datum |
Referenced vertical datum |
Status |
Method of measurement |
Measuring agency |
Source of measurement |
Water-level approval status |
---|---|---|---|---|---|---|---|---|---|---|---|
1983-10-13 | 13:25 UTC | m | 62610 |   | 9.35 | NGVD29 | 1 | Z |   |   | A |
1983-10-13 | 13:25 UTC | m | 62611 |   | 9.13 | NAVD88 | 1 | Z |   |   | A |
1983-10-13 | 13:25 UTC | m | 72019 | 3.87 |   |   | 1 | Z |   |   | A |
1983-11-08 | 15:45 UTC | m | 62610 |   | 8.75 | NGVD29 | 1 | Z |   |   | A |
1983-11-08 | 15:45 UTC | m | 62611 |   | 8.53 | NAVD88 | 1 | Z |   |   | A |
1983-11-08 | 15:45 UTC | m | 72019 | 4.47 |   |   | 1 | Z |   |   | A |
1983-12-14 | 21:10 UTC | m | 62610 |   | 9.31 | NGVD29 | 1 | Z |   |   | A |
1983-12-14 | 21:10 UTC | m | 62611 |   | 9.09 | NAVD88 | 1 | Z |   |   | A |
1983-12-14 | 21:10 UTC | m | 72019 | 3.91 |   |   | 1 | Z |   |   | A |
1984-01-09 | 19:30 UTC | m | 62610 |   | 9.29 | NGVD29 | 1 | Z |   |   | A |
1984-01-09 | 19:30 UTC | m | 62611 |   | 9.07 | NAVD88 | 1 | Z |   |   | A |
1984-01-09 | 19:30 UTC | m | 72019 | 3.93 |   |   | 1 | Z |   |   | A |
1984-02-07 | 17:30 UTC | m | 62610 |   | 9.33 | NGVD29 | 1 | Z |   |   | A |
1984-02-07 | 17:30 UTC | m | 62611 |   | 9.11 | NAVD88 | 1 | Z |   |   | A |
1984-02-07 | 17:30 UTC | m | 72019 | 3.89 |   |   | 1 | Z |   |   | A |
1984-03-08 | 16:55 UTC | m | 62610 |   | 10.28 | NGVD29 | 1 | Z |   |   | A |
1984-03-08 | 16:55 UTC | m | 62611 |   | 10.06 | NAVD88 | 1 | Z |   |   | A |
1984-03-08 | 16:55 UTC | m | 72019 | 2.94 |   |   | 1 | Z |   |   | A |
1984-11-01 | 16:03 UTC | m | 62610 |   | 8.62 | NGVD29 | 1 | Z |   |   | A |
1984-11-01 | 16:03 UTC | m | 62611 |   | 8.40 | NAVD88 | 1 | Z |   |   | A |
1984-11-01 | 16:03 UTC | m | 72019 | 4.60 |   |   | 1 | Z |   |   | A |
1985-04-10 | 19:54 UTC | m | 62610 |   | 8.87 | NGVD29 | 1 | Z |   |   | A |
1985-04-10 | 19:54 UTC | m | 62611 |   | 8.65 | NAVD88 | 1 | Z |   |   | A |
1985-04-10 | 19:54 UTC | m | 72019 | 4.35 |   |   | 1 | Z |   |   | A |
1985-05-08 | 18:14 UTC | m | 62610 |   | 8.49 | NGVD29 | 1 | Z |   |   | A |
1985-05-08 | 18:14 UTC | m | 62611 |   | 8.27 | NAVD88 | 1 | Z |   |   | A |
1985-05-08 | 18:14 UTC | m | 72019 | 4.73 |   |   | 1 | Z |   |   | A |
1985-07-18 | 20:08 UTC | m | 62610 |   | 8.79 | NGVD29 | 1 | Z |   |   | A |
1985-07-18 | 20:08 UTC | m | 62611 |   | 8.57 | NAVD88 | 1 | Z |   |   | A |
1985-07-18 | 20:08 UTC | m | 72019 | 4.43 |   |   | 1 | Z |   |   | A |
1985-07-19 | 20:03 UTC | m | 62610 |   | 8.76 | NGVD29 | 1 | Z |   |   | A |
1985-07-19 | 20:03 UTC | m | 62611 |   | 8.54 | NAVD88 | 1 | Z |   |   | A |
1985-07-19 | 20:03 UTC | m | 72019 | 4.46 |   |   | 1 | Z |   |   | A |
1985-07-20 | 18:30 UTC | m | 62610 |   | 8.70 | NGVD29 | 1 | Z |   |   | A |
1985-07-20 | 18:30 UTC | m | 62611 |   | 8.48 | NAVD88 | 1 | Z |   |   | A |
1985-07-20 | 18:30 UTC | m | 72019 | 4.52 |   |   | 1 | Z |   |   | A |
1986-01-27 | 19:12 UTC | m | 62610 |   | 9.37 | NGVD29 | 1 | Z |   |   | A |
1986-01-27 | 19:12 UTC | m | 62611 |   | 9.15 | NAVD88 | 1 | Z |   |   | A |
1986-01-27 | 19:12 UTC | m | 72019 | 3.85 |   |   | 1 | Z |   |   | A |
Section | Code | Description |
---|---|---|
Water-level date-time accuracy | m | Date is accurate to the Minute |
Parameter code | 62610 | Groundwater level above NGVD 1929, feet |
Parameter code | 62611 | Groundwater level above NAVD 1988, feet |
Parameter code | 72019 | Depth to water level, feet below land surface |
Referenced vertical datum | NAVD88 | North American Vertical Datum of 1988 |
Referenced vertical datum | NGVD29 | National Geodetic Vertical Datum of 1929 |
Status | 1 | Static |
Method of measurement | Z | Other. |
Measuring agency | Not determined | |
Source of measurement | Not determined | |
Water-level approval status | A | Approved for publication -- Processing and review completed. |