Warning: Javascript must be enabled to use all the features on this page!


Page Loading - Please Wait...

Click to hideNews Bulletins

Groundwater levels for the Nation

! Important: Next Generation Monitoring Location Page

Search Results -- 1 sites found

Agency code = usgs
site_no list =
  • 320130084004201
Minimum number of levels = 1
Save file of selected sites to local disk for future upload

USGS 320130084004201 13Q067

Sumter County, Georgia
Latitude  32°01'30", Longitude  84°00'42" NAD27
Land-surface elevation 256.97 feet above NGVD29
The depth of the well is 8.7 feet below land surface.
The depth of the hole is 8.7 feet below land surface.
This well is completed in the Floridan aquifer system (S400FLORDN) national aquifer.
This well is completed in the Eocene Series (124EOCN) local aquifer.
Output formats
Table of data
Tab-separated data
Graph of data
Reselect period
Date Time
?
 
Water-level
date-time
accuracy
?
 
Parameter
code
Water
level,
feet
below
land
surface
Water
level,
feet
above
specific
vertical
datum
Referenced
vertical
datum
?
 
Status
?
 
Method of
measurement
?
 
Measuring
agency
?
 
Source of
measurement
?
 
Water-level
approval
status
1993-08-2821:16 UTCm62610 252.61NGVD291S  A
1993-08-2821:16 UTCm62611 252.11NAVD881S  A
1993-08-2821:16 UTCm720194.36  1S  A
1993-09-0115:19 UTCm62610 252.18NGVD291S  A
1993-09-0115:19 UTCm62611 251.68NAVD881S  A
1993-09-0115:19 UTCm720194.79  1S  A
1993-11-24 D62610 253.53NGVD291S  A
1993-11-24 D62611 253.03NAVD881S  A
1993-11-24 D720193.44  1S  A
1993-12-21 D62610 253.63NGVD291S  A
1993-12-21 D62611 253.13NAVD881S  A
1993-12-21 D720193.34  1S  A
1994-01-27 D62610 253.79NGVD291S  A
1994-01-27 D62611 253.29NAVD881S  A
1994-01-27 D720193.18  1S  A
1994-02-08 D62610 254.21NGVD291S  A
1994-02-08 D62611 253.71NAVD881S  A
1994-02-08 D720192.76  1S  A
1994-02-0920:00 UTCm62610 254.21NGVD291OUSGSSA
1994-02-0920:00 UTCm62611 253.71NAVD881OUSGSSA
1994-02-0920:00 UTCm720192.76  1OUSGSSA
1994-03-23 D62610 254.09NGVD291S  A
1994-03-23 D62611 253.59NAVD881S  A
1994-03-23 D720192.88  1S  A
1994-05-31 D62610 253.40NGVD291S  A
1994-05-31 D62611 252.90NAVD881S  A
1994-05-31 D720193.57  1S  A
1994-06-16 D62610 253.78NGVD291S  A
1994-06-16 D62611 253.28NAVD881S  A
1994-06-16 D720193.19  1S  A
1994-07-21 D62610 253.93NGVD291S  A
1994-07-21 D62611 253.43NAVD881S  A
1994-07-21 D720193.04  1S  A
1994-08-22 D62610 254.22NGVD291S  A
1994-08-22 D62611 253.72NAVD881S  A
1994-08-22 D720192.75  1S  A
1994-08-2417:35 UTCm62610 254.22NGVD291OUSGSSA
1994-08-2417:35 UTCm62611 253.72NAVD881OUSGSSA
1994-08-2417:35 UTCm720192.75  1OUSGSSA
1994-09-28 D62610 253.72NGVD291S  A
1994-09-28 D62611 253.22NAVD881S  A
1994-09-28 D720193.25  1S  A
1994-10-28 D62610 254.21NGVD291S  A
1994-10-28 D62611 253.71NAVD881S  A
1994-10-28 D720192.76  1S  A
1994-12-08 D62610 254.48NGVD291S  A
1994-12-08 D62611 253.98NAVD881S  A
1994-12-08 D720192.49  1S  A
1995-01-09 D62610 254.34NGVD291S  A
1995-01-09 D62611 253.84NAVD881S  A
1995-01-09 D720192.63  1S  A
1995-03-08 D62610 254.33NGVD291S  A
1995-03-08 D62611 253.83NAVD881S  A
1995-03-08 D720192.64  1S  A
1995-04-21 D62610 253.66NGVD291S  A
1995-04-21 D62611 253.16NAVD881S  A
1995-04-21 D720193.31  1S  A
1995-05-17 D62610 253.14NGVD291S  A
1995-05-17 D62611 252.64NAVD881S  A
1995-05-17 D720193.83  1S  A
1995-06-08 D62610 253.87NGVD291S  A
1995-06-08 D62611 253.37NAVD881S  A
1995-06-08 D720193.10  1S  A
1995-07-10 D62610 252.01NGVD291S  A
1995-07-10 D62611 251.51NAVD881S  A
1995-07-10 D720194.96  1S  A
1995-08-2314:30 UTCm62610 252.85NGVD291OUSGSSA
1995-08-2314:30 UTCm62611 252.35NAVD881OUSGSSA
1995-08-2314:30 UTCm720194.12  1OUSGSSA
1995-09-20 D62610 252.54NGVD291S  A
1995-09-20 D62611 252.04NAVD881S  A
1995-09-20 D720194.43  1S  A

Explanation
SectionCodeDescription
Water-level date-time accuracyDDate is accurate to the Day
Water-level date-time accuracymDate is accurate to the Minute
Parameter code62610Groundwater level above NGVD 1929, feet
Parameter code62611Groundwater level above NAVD 1988, feet
Parameter code72019Depth to water level, feet below land surface
Referenced vertical datumNAVD88North American Vertical Datum of 1988
Referenced vertical datumNGVD29National Geodetic Vertical Datum of 1929
Status1Static
Method of measurementOObserved.
Method of measurementSSteel-tape measurement.
Measuring agencyNot determined
Measuring agencyUSGSU.S. Geological Survey
Source of measurementNot determined
Source of measurementSMeasured by personnel of reporting agency.
Water-level approval statusAApproved for publication -- Processing and review completed.