Page Loading - Please Wait...
Groundwater levels for the Nation
Agency code = | usgs |
---|---|
site_no list = |
|
Minimum number of levels = | 1 |
Table of data |
Tab-separated data |
Graph of data |
Reselect period |
Date | Time |
Water-level date-time accuracy |
Parameter code | Water level, feet below land surface |
Water level, feet above specific vertical datum |
Referenced vertical datum |
Status |
Method of measurement |
Measuring agency |
Source of measurement |
Water-level approval status |
---|---|---|---|---|---|---|---|---|---|---|---|
1978-08-18 | D | 62610 |   | -42.00 | NGVD29 | 1 | Z |   |   | A | |
1978-08-18 | D | 62611 |   | -39.30 | NAVD88 | 1 | Z |   |   | A | |
1978-08-18 | D | 72019 | 112.00 |   |   | 1 | Z |   |   | A | |
1978-09-14 | D | 62610 |   | -42.40 | NGVD29 | 1 | Z |   |   | A | |
1978-09-14 | D | 62611 |   | -39.70 | NAVD88 | 1 | Z |   |   | A | |
1978-09-14 | D | 72019 | 112.40 |   |   | 1 | Z |   |   | A | |
1978-10-17 | D | 62610 |   | -48.40 | NGVD29 | 1 | Z |   |   | A | |
1978-10-17 | D | 62611 |   | -45.70 | NAVD88 | 1 | Z |   |   | A | |
1978-10-17 | D | 72019 | 118.40 |   |   | 1 | Z |   |   | A | |
1978-11-08 | D | 62610 |   | -39.70 | NGVD29 | 1 | Z |   |   | A | |
1978-11-08 | D | 62611 |   | -37.00 | NAVD88 | 1 | Z |   |   | A | |
1978-11-08 | D | 72019 | 109.70 |   |   | 1 | Z |   |   | A | |
1978-12-14 | D | 62610 |   | -40.90 | NGVD29 | 1 | Z |   |   | A | |
1978-12-14 | D | 62611 |   | -38.20 | NAVD88 | 1 | Z |   |   | A | |
1978-12-14 | D | 72019 | 110.90 |   |   | 1 | Z |   |   | A | |
1979-01-15 | D | 62610 |   | -41.30 | NGVD29 | 1 | Z |   |   | A | |
1979-01-15 | D | 62611 |   | -38.60 | NAVD88 | 1 | Z |   |   | A | |
1979-01-15 | D | 72019 | 111.30 |   |   | 1 | Z |   |   | A | |
1979-02-14 | D | 62610 |   | -40.20 | NGVD29 | 1 | Z |   |   | A | |
1979-02-14 | D | 62611 |   | -37.50 | NAVD88 | 1 | Z |   |   | A | |
1979-02-14 | D | 72019 | 110.20 |   |   | 1 | Z |   |   | A | |
1979-03-15 | D | 62610 |   | -40.70 | NGVD29 | 1 | Z |   |   | A | |
1979-03-15 | D | 62611 |   | -38.00 | NAVD88 | 1 | Z |   |   | A | |
1979-03-15 | D | 72019 | 110.70 |   |   | 1 | Z |   |   | A | |
1979-04-20 | D | 62610 |   | -40.40 | NGVD29 | 1 | Z |   |   | A | |
1979-04-20 | D | 62611 |   | -37.70 | NAVD88 | 1 | Z |   |   | A | |
1979-04-20 | D | 72019 | 110.40 |   |   | 1 | Z |   |   | A | |
1979-05-23 | D | 62610 |   | -40.40 | NGVD29 | 1 | Z |   |   | A | |
1979-05-23 | D | 62611 |   | -37.70 | NAVD88 | 1 | Z |   |   | A | |
1979-05-23 | D | 72019 | 110.40 |   |   | 1 | Z |   |   | A | |
1979-06-20 | D | 62610 |   | -39.80 | NGVD29 | 1 | Z |   |   | A | |
1979-06-20 | D | 62611 |   | -37.10 | NAVD88 | 1 | Z |   |   | A | |
1979-06-20 | D | 72019 | 109.80 |   |   | 1 | Z |   |   | A | |
1979-07-18 | D | 62610 |   | -40.90 | NGVD29 | 1 | Z |   |   | A | |
1979-07-18 | D | 62611 |   | -38.20 | NAVD88 | 1 | Z |   |   | A | |
1979-07-18 | D | 72019 | 110.90 |   |   | 1 | Z |   |   | A | |
1979-08-20 | D | 62610 |   | 70.00 | NGVD29 | 1 | Z |   |   | A | |
1979-08-20 | D | 62611 |   | 72.70 | NAVD88 | 1 | Z |   |   | A | |
1979-08-20 | D | 72019 | 0.00 |   |   | 1 | Z |   |   | A | |
1979-09-20 | D | 62610 |   | -38.09 | NGVD29 | 1 | S |   |   | A | |
1979-09-20 | D | 62611 |   | -35.39 | NAVD88 | 1 | S |   |   | A | |
1979-09-20 | D | 72019 | 108.09 |   |   | 1 | S |   |   | A | |
1979-11-26 | D | 62610 |   | -40.54 | NGVD29 | 1 | S |   |   | A | |
1979-11-26 | D | 62611 |   | -37.84 | NAVD88 | 1 | S |   |   | A | |
1979-11-26 | D | 72019 | 110.54 |   |   | 1 | S |   |   | A | |
1979-12-19 | D | 62610 |   | -41.16 | NGVD29 | 1 | S |   |   | A | |
1979-12-19 | D | 62611 |   | -38.46 | NAVD88 | 1 | S |   |   | A | |
1979-12-19 | D | 72019 | 111.16 |   |   | 1 | S |   |   | A | |
1980-01-21 | D | 62610 |   | -40.45 | NGVD29 | 1 | S |   |   | A | |
1980-01-21 | D | 62611 |   | -37.75 | NAVD88 | 1 | S |   |   | A | |
1980-01-21 | D | 72019 | 110.45 |   |   | 1 | S |   |   | A | |
1980-02-21 | D | 62610 |   | -41.33 | NGVD29 | 1 | V |   |   | A | |
1980-02-21 | D | 62611 |   | -38.63 | NAVD88 | 1 | V |   |   | A | |
1980-02-21 | D | 72019 | 111.33 |   |   | 1 | V |   |   | A | |
1980-03-21 | D | 62610 |   | -43.69 | NGVD29 | 1 | S |   |   | A | |
1980-03-21 | D | 62611 |   | -40.99 | NAVD88 | 1 | S |   |   | A | |
1980-03-21 | D | 72019 | 113.69 |   |   | 1 | S |   |   | A | |
1980-04-22 | D | 62610 |   | -40.78 | NGVD29 | 1 | S |   |   | A | |
1980-04-22 | D | 62611 |   | -38.08 | NAVD88 | 1 | S |   |   | A | |
1980-04-22 | D | 72019 | 110.78 |   |   | 1 | S |   |   | A | |
1980-05-15 | D | 62610 |   | -39.98 | NGVD29 | 1 | S |   |   | A | |
1980-05-15 | D | 62611 |   | -37.28 | NAVD88 | 1 | S |   |   | A | |
1980-05-15 | D | 72019 | 109.98 |   |   | 1 | S |   |   | A | |
1980-06-20 | D | 62610 |   | -43.90 | NGVD29 | 1 | S |   |   | A | |
1980-06-20 | D | 62611 |   | -41.20 | NAVD88 | 1 | S |   |   | A | |
1980-06-20 | D | 72019 | 113.90 |   |   | 1 | S |   |   | A | |
1980-08-19 | D | 62610 |   | -40.55 | NGVD29 | 1 | S |   |   | A | |
1980-08-19 | D | 62611 |   | -37.85 | NAVD88 | 1 | S |   |   | A | |
1980-08-19 | D | 72019 | 110.55 |   |   | 1 | S |   |   | A | |
1980-09-25 | D | 62610 |   | -42.84 | NGVD29 | P | S |   |   | A | |
1980-09-25 | D | 62611 |   | -40.14 | NAVD88 | P | S |   |   | A | |
1980-09-25 | D | 72019 | 112.84 |   |   | P | S |   |   | A | |
1980-10-17 | D | 62610 |   | -42.16 | NGVD29 | P | S |   |   | A | |
1980-10-17 | D | 62611 |   | -39.46 | NAVD88 | P | S |   |   | A | |
1980-10-17 | D | 72019 | 112.16 |   |   | P | S |   |   | A | |
1980-11-20 | D | 62610 |   | -42.08 | NGVD29 | 1 | S |   |   | A | |
1980-11-20 | D | 62611 |   | -39.38 | NAVD88 | 1 | S |   |   | A | |
1980-11-20 | D | 72019 | 112.08 |   |   | 1 | S |   |   | A | |
1981-01-19 | D | 62610 |   | -35.10 | NGVD29 | 1 | S |   |   | A | |
1981-01-19 | D | 62611 |   | -32.40 | NAVD88 | 1 | S |   |   | A | |
1981-01-19 | D | 72019 | 105.10 |   |   | 1 | S |   |   | A | |
1981-02-20 | D | 62610 |   | -33.60 | NGVD29 | 1 | S |   |   | A | |
1981-02-20 | D | 62611 |   | -30.90 | NAVD88 | 1 | S |   |   | A | |
1981-02-20 | D | 72019 | 103.60 |   |   | 1 | S |   |   | A | |
1981-03-19 | D | 62610 |   | -40.67 | NGVD29 | 1 | S |   |   | A | |
1981-03-19 | D | 62611 |   | -37.97 | NAVD88 | 1 | S |   |   | A | |
1981-03-19 | D | 72019 | 110.67 |   |   | 1 | S |   |   | A | |
1981-09-14 | D | 62610 |   | -40.84 | NGVD29 | 1 | S |   |   | A | |
1981-09-14 | D | 62611 |   | -38.14 | NAVD88 | 1 | S |   |   | A | |
1981-09-14 | D | 72019 | 110.84 |   |   | 1 | S |   |   | A |
Section | Code | Description |
---|---|---|
Water-level date-time accuracy | D | Date is accurate to the Day |
Parameter code | 62610 | Groundwater level above NGVD 1929, feet |
Parameter code | 62611 | Groundwater level above NAVD 1988, feet |
Parameter code | 72019 | Depth to water level, feet below land surface |
Referenced vertical datum | NAVD88 | North American Vertical Datum of 1988 |
Referenced vertical datum | NGVD29 | National Geodetic Vertical Datum of 1929 |
Status | 1 | Static |
Status | P | Pumping |
Method of measurement | S | Steel-tape measurement. |
Method of measurement | V | Calibrated electric-tape measurement. |
Method of measurement | Z | Other. |
Measuring agency | Not determined | |
Source of measurement | Not determined | |
Water-level approval status | A | Approved for publication -- Processing and review completed. |