Page Loading - Please Wait...
Groundwater levels for the Nation
Agency code = | usgs |
---|---|
site_no list = |
|
Minimum number of levels = | 1 |
Table of data |
Tab-separated data |
Graph of data |
Reselect period |
Date | Time |
Water-level date-time accuracy |
Parameter code | Water level, feet below land surface |
Water level, feet above specific vertical datum |
Referenced vertical datum |
Status |
Method of measurement |
Measuring agency |
Source of measurement |
Water-level approval status |
---|---|---|---|---|---|---|---|---|---|---|---|
1993-05-06 | D | 62610 |   | 4025.14 | NGVD29 | 1 | S |   |   | A | |
1993-05-06 | D | 62611 |   | 4028.26 | NAVD88 | 1 | S |   |   | A | |
1993-05-06 | D | 72019 | 128.93 |   |   | 1 | S |   |   | A | |
1993-06-07 | D | 62610 |   | 4022.90 | NGVD29 | 1 | S |   |   | A | |
1993-06-07 | D | 62611 |   | 4026.02 | NAVD88 | 1 | S |   |   | A | |
1993-06-07 | D | 72019 | 131.17 |   |   | 1 | S |   |   | A | |
2002-06-17 | D | 62610 |   | 4046.79 | NGVD29 | 1 | S | USGS | S | A | |
2002-06-17 | D | 62611 |   | 4049.91 | NAVD88 | 1 | S | USGS | S | A | |
2002-06-17 | D | 72019 | 107.28 |   |   | 1 | S | USGS | S | A | |
2004-06-15 | D | 62610 |   | 4013.20 | NGVD29 | 1 | S | USGS | S | A | |
2004-06-15 | D | 62611 |   | 4016.32 | NAVD88 | 1 | S | USGS | S | A | |
2004-06-15 | D | 72019 | 140.87 |   |   | 1 | S | USGS | S | A | |
2007-06-11 | 21:08 UTC | m | 62610 |   | 4013.10 | NGVD29 | 1 | V | USGS | S | A |
2007-06-11 | 21:08 UTC | m | 62611 |   | 4016.22 | NAVD88 | 1 | V | USGS | S | A |
2007-06-11 | 21:08 UTC | m | 72019 | 140.97 |   |   | 1 | V | USGS | S | A |
2009-06-18 | 21:00 UTC | m | 62610 |   | 4010.27 | NGVD29 | 1 | V | USGS | S | A |
2009-06-18 | 21:00 UTC | m | 62611 |   | 4013.39 | NAVD88 | 1 | V | USGS | S | A |
2009-06-18 | 21:00 UTC | m | 72019 | 143.80 |   |   | 1 | V | USGS | S | A |
2010-06-09 | 23:12 UTC | m | 62610 |   | 4011.21 | NGVD29 | 1 | V | USGS | S | A |
2010-06-09 | 23:12 UTC | m | 62611 |   | 4014.33 | NAVD88 | 1 | V | USGS | S | A |
2010-06-09 | 23:12 UTC | m | 72019 | 142.86 |   |   | 1 | V | USGS | S | A |
2011-06-13 | 22:06 UTC | m | 62610 |   | 4011.25 | NGVD29 | 1 | V | USGS | S | A |
2011-06-13 | 22:06 UTC | m | 62611 |   | 4014.37 | NAVD88 | 1 | V | USGS | S | A |
2011-06-13 | 22:06 UTC | m | 72019 | 142.82 |   |   | 1 | V | USGS | S | A |
2012-06-20 | 18:54 UTC | m | 62610 |   | 4009.89 | NGVD29 | 1 | V | USGS | S | A |
2012-06-20 | 18:54 UTC | m | 62611 |   | 4013.01 | NAVD88 | 1 | V | USGS | S | A |
2012-06-20 | 18:54 UTC | m | 72019 | 144.18 |   |   | 1 | V | USGS | S | A |
2016-06-14 | 21:56 UTC | m | 62610 |   | 4007.69 | NGVD29 | 1 | V | USGS | S | A |
2016-06-14 | 21:56 UTC | m | 62611 |   | 4010.81 | NAVD88 | 1 | V | USGS | S | A |
2016-06-14 | 21:56 UTC | m | 72019 | 146.38 |   |   | 1 | V | USGS | S | A |
2018-06-26 | 22:52 UTC | m | 62610 |   | 4009.88 | NGVD29 | 1 | V | USGS | S | A |
2018-06-26 | 22:52 UTC | m | 62611 |   | 4013.00 | NAVD88 | 1 | V | USGS | S | A |
2018-06-26 | 22:52 UTC | m | 72019 | 144.19 |   |   | 1 | V | USGS | S | A |
2020-07-20 | 18:20 UTC | m | 62610 |   | 4008.48 | NGVD29 | 1 | V | USGS | S | A |
2020-07-20 | 18:20 UTC | m | 62611 |   | 4011.60 | NAVD88 | 1 | V | USGS | S | A |
2020-07-20 | 18:20 UTC | m | 72019 | 145.59 |   |   | 1 | V | USGS | S | A |
2022-06-27 | 21:30 UTC | m | 62610 |   | 4007.85 | NGVD29 | 1 | V | USGS | S | A |
2022-06-27 | 21:30 UTC | m | 62611 |   | 4010.97 | NAVD88 | 1 | V | USGS | S | A |
2022-06-27 | 21:30 UTC | m | 72019 | 146.22 |   |   | 1 | V | USGS | S | A |
Section | Code | Description |
---|---|---|
Water-level date-time accuracy | D | Date is accurate to the Day |
Water-level date-time accuracy | m | Date is accurate to the Minute |
Parameter code | 62610 | Groundwater level above NGVD 1929, feet |
Parameter code | 62611 | Groundwater level above NAVD 1988, feet |
Parameter code | 72019 | Depth to water level, feet below land surface |
Referenced vertical datum | NAVD88 | North American Vertical Datum of 1988 |
Referenced vertical datum | NGVD29 | National Geodetic Vertical Datum of 1929 |
Status | 1 | Static |
Method of measurement | S | Steel-tape measurement. |
Method of measurement | V | Calibrated electric-tape measurement. |
Measuring agency | Not determined | |
Measuring agency | USGS | U.S. Geological Survey |
Source of measurement | Not determined | |
Source of measurement | S | Measured by personnel of reporting agency. |
Water-level approval status | A | Approved for publication -- Processing and review completed. |