This site is operated seasonally, April through September only.
Station operated by the U.S. Geological Survey in cooperation with Mile High Flood District.
Current shift adjusted rating
table.
What
is a shift adjusted stage-discharge rating?
Min (2024) | Most Recent Instantaneous Value Jul 13 | 25th percen- tile | Median | 75th percen- tile | Mean | Max (2013) |
---|---|---|---|---|---|---|
0.20 | 0.34 | 0.79 | 1.7 | 3.7 | 4.5 | 33.1 |