Warning: Javascript must be enabled to use all the features on this page!


Page Loading - Please Wait...

Click to hideNews Bulletins

Water-Year Summary for Site 01342730

Click to hide Water-Year Summary instructions and information
  • Water-Year Summary reports summarize a year of hydrologic data in a printer-friendly format.
  • For water years 2014 onward, choose a water year and parameter and an on-demand Water-Year Summary report will be generated.
  • For water years 2006 through 2013, choose a water year and an Annual Water Data Report will be provided.
  • For water years 2005 and earlier, Annual Water Data Reports may be available in digital format.
  • Not all sites have reports available for every water year.
Available Parameters
00060 Discharge(Mean)  

Water year 2023: 2022-10-01 to 2023-09-30
 

Print this page
USGS Water-Year Summary 2023
01342730 STEELE CREEK AT ILION, NY
LOCATION - Lat 43°00'23.7", long 75°02'30.0" referenced to North American Datum of 1983, Herkimer County, NY, Hydrologic Unit 02020004, on left bank at downstream side of bridge on Frederick Street in Ilion, and 1.2 mi upstream from mouth.
DRAINAGE AREA - 26.4 mi².
REVISIONS HISTORY - WDR-NY-83-1: 1972-82(M).
SURFACE-WATER RECORDS
PERIOD OF RECORD - Annual maximum only--1964-66, 1969, 1971-83, 1985-86, 2000. Miscellaneous measurements--2002-03. November 1966 to September 1968, October 2014 to current year.
GAGE - Water-stage recorder and crest-stage gage. Datum of gage is 426.52 ft above NAVD of 1988. Prior to October 2014, nonrecording gages at site 0.4 mi upstream at datum 34.42 ft higher. October 2014 to July 8, 2020, at same site but at datum 8.69 ft higher. July 8, 2020 to Sept. 9, 2021, at site 0.2 mi downstream at different datum.
REMARKS - Water Years 2015-23: Records fair except those for estimated daily discharges, which are poor.
EXTREMES FOR PERIOD OF RECORD - Maximum discharge, 2,100 ft³/s, May 13, 2000, gage height, 5.69 ft, site and datum then in use, from rating curve extended above 450 ft³/s on basis of contracted-opening measurement at gage height 4.93 ft, site and datum then in use; minimum discharge, 4.4 ft³/s, Aug. 7, 2018.