Warning: Javascript must be enabled to use all the features on this page!


Page Loading - Please Wait...

Click to hideNews Bulletins

Water-Year Summary for Site 06309000

Click to hide Water-Year Summary instructions and information
  • Water-Year Summary reports summarize a year of hydrologic data in a printer-friendly format.
  • For water years 2014 onward, choose a water year and parameter and an on-demand Water-Year Summary report will be generated.
  • For water years 2006 through 2013, choose a water year and an Annual Water Data Report will be provided.
  • For water years 2005 and earlier, Annual Water Data Reports may be available in digital format.
  • Not all sites have reports available for every water year.
Available Parameters
00060 Discharge(Mean)  

Water year 2023: 2022-10-01 to 2023-09-30
 

Print this page
USGS Water-Year Summary 2023
06309000 YELLOWSTONE RIVER AT MILES CITY, MT
LOCATION - Lat 46°25'14.78", long 105°51'36.12" referenced to North American Datum of 1983, in NE 1/4 SW 1/4 NW 1/4 sec.28, T.8 N., R.47 E., Custer County, MT, Hydrologic Unit 10100001, on left bank at upstream side of bridge on State Highway 22 at Miles City, 0.8 mi downstream from Tongue River, and at river mile 184.2.
DRAINAGE AREA - 48,287.7 mi² of which 691.7 mi² probably is noncontributing.
REVISIONS HISTORY - WSP 1729: Drainage area.
SURFACE-WATER RECORDS
PERIOD OF RECORD - September 1922 to September 1923, August 1928 to current year. Monthly discharge only for some periods, published in Water Supply Paper (WSP) 1309.
GAGE - Water-stage recorder. Elevation of gage is 2,333.3 ft, referenced to the National Geodetic Vertical Datum of 1929, levels by U.S. Army Corps of Engineers. Prior to May 6,1929, nonrecording gages 1.2 mi downstream at different elevations. May 6, 1929, to Sept. 30, 1931, nonrecording gage, and Oct. 1, 1931, to Nov. 10, 1937, water-stage recorder 300 ft upstream from present site at same elevation. Nov. 11, 1937, to Sept. 30, 1946, water-stage recorder 1.2 mi downstream at different elevation. Oct. 1, 1946, to Mar. 15, 1979, water-stage recorder at site 300 ft upstream at present elevation. Mar. 16, 1979, to Sept. 21, 1979, nonrecording gage at present site and elevation. Sept. 22, 1979, recording gage established at same site and elevation.
REMARKS - Partially regulated flow by Yellowtail Dam. Several diversions for irrigation occur upstream of station.