Warning: Javascript must be enabled to use all the features on this page!


Page Loading - Please Wait...

* We've detected you're using a mobile device. Find our Next Generation Station Page here.
Click to hideNews Bulletins

Water-Year Summary for Site 12052210

Click to hide Water-Year Summary instructions and information
  • Water-Year Summary reports summarize a year of hydrologic data in a printer-friendly format.
  • For water years 2014 onward, choose a water year and parameter and an on-demand Water-Year Summary report will be generated.
  • For water years 2006 through 2013, choose a water year and an Annual Water Data Report will be provided.
  • For water years 2005 and earlier, Annual Water Data Reports may be available in digital format.
  • Not all sites have reports available for every water year.
Available Parameters
00060 Discharge(Mean)  

Water year 2024: 2024-10-01 to 2025-09-30
 

Print this page
USGS Water-Year Summary 2024
12052210 BIG QUILCENE RIVER BELOW DIVERSION DAM, NEAR QUILCENE, WA
LOCATION - Lat 47°47'05", long 122°58'42" referenced to North American Datum of 1927, in SW 1/4 SE 1/4 sec.31, T.27 N., R.2 W., Jefferson County, WA, Hydrologic Unit 17110018, on left bank, 5.5 mi southwest of Quilcene, and at river mile 9.4. Drainage area is 49.4 square miles. Datum of gage is 1,009.23 ft. above NGVD of 1929.
DRAINAGE AREA - 49.4 mi².
REVISIONS HISTORY - WDR WA-04-1: 1996-2000 (M).
SURFACE-WATER RECORDS
PERIOD OF RECORD - January 1994 to current year.
GAGE - Water-stage recorder and crest-stage gage. Datum of gage is and 1,009.23 ft above NGVD of 1929 and is 1,012.62 ft above NAVD of 1988 (USGS GNSS Level II survey July 7, 2021) . 
REMARKS - Water for municipal use is diverted about 100 feet upstream by City of Port Townsend.
EXTREMES FOR PERIOD OF RECORD - Maximum discharge, 5,620 ft³/s, Dec. 12, 1995, revised, gage height, 6.41 ft, revised, from rating curve extended above 2,000 ft³/s; minimum discharge, 11 ft³/s, Sept. 26, 2002.