Warning: Javascript must be enabled to use all the features on this page!
* We've detected you're using a mobile device. Find our Next Generation Station Page here.
Click to hideNews Bulletins
  • Explore the NEW USGS National Water Dashboard interactive map to access real-time water data from over 13,500 stations nationwide.
  • How are we doing? We want to hear from you. Take our quick survey to tell us what you think.

USGS Current Water Data for Utah

Click to hide state-specific text
UTAH




Daily Streamflow Conditions

Select a site to retrieve data and station information.
Stream gage levels in Utah, relative to 30 year average. 13078000: Flow=24.9cfs,Stage=5.12ft,2024-10-10 02:15,High,RAFT RIVER AB ONEMILE CREEK NR MALTA ID10224000: Flow=246cfs,Stage=4.18ft,2024-10-10 02:00,>90,SEVIER RIVER NEAR LYNNDYL, UT10219000: Flow=262cfs,Stage=5.14ft,2024-10-10 02:00,>90,SEVIER RIVER NEAR JUAB, UT10189000: Flow=165cfs,Stage=4.59ft,Floodstage=9ft,2024-10-10 02:30,>90,EAST FORK SEVIER RIVER NEAR KINGSTON, UT10171000: Flow=227cfs,Stage=2.66ft,2024-10-10 02:15,>90,JORDAN RIVER @ 1700 SOUTH @ SALT LAKE CITY, UT10108400: Flow=43.8cfs,Stage=2.93ft,2024-10-10 02:30,>90,CACHE HIGHLINE CANAL NEAR LOGAN, UTAH09409100: Flow=10.2cfs,Stage=10.99ft,2024-10-10 01:45,>90,SANTA CLARA RIVER ABV BAKER RES, NR CENTRAL, UT09310700: Flow=22.3cfs,Stage=2.42ft,2024-10-10 02:00,>90,MUD CRK BL WINTER QUARTERS CYN @ SCOFIELD, UT10217000: Flow=55.0cfs,Stage=4.53ft,2024-10-10 02:30,<10,SEVIER RIV BLW SAN PITCH RIV NR GUNNISON, UT10020100: Flow=2.59cfs,Stage=0.18ft,2024-10-10 01:45,<10,BEAR RIVER ABOVE RESERVOIR, NEAR WOODRUFF, UT09379200: Flow=0.00cfs,Stage=1.77ft,2024-10-10 01:00,<10,CHINLE CREEK NEAR MEXICAN WATER, AZ09371010: Flow=578cfs,Stage=5.68ft,2024-10-10 02:00,<10,SAN JUAN RIVER AT FOUR CORNERS, CO09328500: Flow=1.07cfs,Stage=4.60ft,2024-10-10 02:45,<10,SAN RAFAEL RIVER NEAR GREEN RIVER, UT09301500: Flow=6.13cfs,Stage=3.40ft,Floodstage=9.9ft,2024-10-10 02:45,<10,UINTA RIVER AT RANDLETT, UT09292500: Flow=62.4cfs,Stage=0.93ft,Floodstage=4.7ft,2024-10-10 02:00,<10,YELLOWSTONE RIVER NEAR ALTONAH, UT09266500: Flow=16.4cfs,Stage=1.85ft,2024-10-10 02:45,<10,ASHLEY CREEK NEAR VERNAL, UT09261700: Flow=11.1cfs,Stage=0.17ft,2024-10-10 02:00,<10,BIG BRUSH CRK ABV RED FLEET RES, NR VERNAL, UT09220000: Flow=9.10cfs,Stage=3.50ft,Floodstage=7.7ft,2024-10-10 02:15,<10,EAST FORK OF SMITHS FORK NEAR ROBERTSON, WY09180000: Flow=67.2cfs,Stage=6.86ft,Floodstage=14ft,2024-10-10 02:45,<10,DOLORES RIVER NEAR CISCO, UT09403600: Flow=3.81cfs,Stage=12.00ft,2024-10-10 02:00,<10,KANAB CREEK NEAR KANAB, UT09337500: Flow=0.26cfs,Stage=1.13ft,2024-10-10 02:25,<10,ESCALANTE RIVER NEAR ESCALANTE, UT09333500: Flow=13.5cfs,Stage=6.14ft,2024-10-10 02:30,<10,DIRTY DEVIL R AB POISON SP WSH NR HANKSVILLE UT09234500: Flow=820cfs,Stage=8.18ft,Floodstage=15.4ft,2024-10-10 02:30,<10,GREEN RIVER NEAR GREENDALE, UT10145400: Flow=6.23cfs,Stage=2.25ft,2024-10-10 01:45,76-90,SALT CRK BL NEPHI POWERPLANT DIV NR NEPHI, UT10140100: Flow=20.9cfs,Stage=1.62ft,Floodstage=7.5ft,2024-10-10 02:30,76-90,OGDEN RIVER BL PINEVIEW RES NR HUNTSVILLE, UT10137500: Flow=56.3cfs,Stage=1.47ft,Floodstage=4.6ft,2024-10-10 02:15,76-90,SOUTH FORK OGDEN RIVER NEAR HUNTSVILLE, UT10134500: Flow=41.0cfs,Stage=0.44ft,Floodstage=2.5ft,2024-10-10 01:45,76-90,EAST CANYON CREEK NEAR MORGAN, UT10132000: Flow=229cfs,Stage=2.47ft,Floodstage=6ft,2024-10-10 02:00,76-90,WEBER RIVER AT ECHO, UT10130500: Flow=229cfs,Stage=2.45ft,Floodstage=6.1ft,2024-10-10 02:30,76-90,WEBER RIVER NEAR COALVILLE, UT10194200: Flow=9.24cfs,Stage=3.40ft,2024-10-10 02:00,10-24,CLEAR CREEK ABOVE DIVERSIONS, NEAR SEVIER, UT10183500: Flow=16.1cfs,Stage=3.42ft,Floodstage=9ft,2024-10-10 02:45,10-24,SEVIER RIVER NEAR KINGSTON, UT10172870: Flow=1.36cfs,Stage=2.73ft,2024-10-10 02:00,10-24,TROUT CREEK NEAR CALLAO, UT10157500: Flow=0.00cfs,Stage=3.59ft,2024-10-10 02:30,10-24,DANIELS CREEK AT CHARLESTON, UT10154200: Flow=49.2cfs,Stage=2.53ft,Floodstage=7.2ft,2024-10-10 02:45,10-24,PROVO RIVER NEAR WOODLAND, UT10141000: Flow=91.4cfs,Stage=10.82ft,Floodstage=27ft,2024-10-10 01:45,10-24,WEBER RIVER NEAR PLAIN CITY, UT10136500: Flow=155cfs,Stage=11.41ft,Floodstage=17ft,2024-10-10 02:30,10-24,WEBER RIVER AT GATEWAY, UT10132500: Flow=6.95cfs,Stage=1.18ft,Floodstage=2.5ft,2024-10-10 01:45,10-24,LOST CREEK NEAR CROYDON, UTAH10128500: Flow=50.7cfs,Stage=5.23ft,Floodstage=9.6ft,2024-10-10 02:15,10-24,WEBER RIVER NEAR OAKLEY, UT10011500: Flow=42.6cfs,Stage=4.08ft,Floodstage=8ft,2024-10-10 02:30,10-24,BEAR RIVER NEAR UTAH-WYOMING STATE LINE09413900: Flow=1.06cfs,Stage=3.86ft,2024-10-10 02:00,10-24,BEAVER DAM WASH NEAR ENTERPRISE, UT09406000: Flow=71.4cfs,Stage=7.51ft,Floodstage=18.9ft,2024-10-10 02:45,10-24,VIRGIN RIVER AT VIRGIN, UT09404450: Flow=7.30cfs,Stage=10.08ft,2024-10-10 02:00,10-24,EAST FORK VIRGIN RIVER NEAR GLENDALE, UT09379500: Flow=583cfs,Stage=5.53ft,Floodstage=23ft,2024-10-10 02:45,10-24,SAN JUAN RIVER NEAR BLUFF, UT09315000: Flow=1680cfs,2024-10-10 02:30,Stage=5.75ft,2024-10-10 02:45:00,Floodstage=15ft,10-24,GREEN RIVER AT GREEN RIVER, UT09306500: Flow=310cfs,Stage=1.95ft,Floodstage=10ft,2024-10-10 01:45,10-24,WHITE RIVER NEAR WATSON, UTAH09302000: Flow=66.1cfs,Stage=5.08ft,Floodstage=13.3ft,2024-10-10 02:00,10-24,DUCHESNE RIVER NEAR RANDLETT, UT09296800: Flow=49.8cfs,Stage=5.08ft,Floodstage=8.3ft,2024-10-10 02:30,10-24,UINTA R BLW POWERPLANT DIVERSION, NR NEOLA, UT09289500: Flow=34.0cfs,Stage=2.01ft,2024-10-10 02:45,10-24,LAKE FORK RIVER AB MOON LAKE, NR MOUNTAIN HOME, UT09279000: Flow=41.5cfs,Stage=1.85ft,Floodstage=5.9ft,2024-10-10 02:00,10-24,ROCK CREEK NEAR MOUNTAIN HOME, UT09277500: Flow=74.2cfs,Stage=0.91ft,Floodstage=5.6ft,2024-10-10 02:30,10-24,DUCHESNE RIVER NEAR TABIONA, UT09261000: Flow=1160cfs,Stage=1.80ft,Floodstage=10.8ft,2024-10-10 02:45,10-24,GREEN RIVER NEAR JENSEN, UT09217900: Flow=35.7cfs,Stage=1.71ft,Floodstage=5ft,2024-10-10 02:00,10-24,BLACKS FORK NEAR ROBERTSON, WY10242000: Flow=9.92cfs,Stage=4.39ft,Floodstage=8.5ft,2024-10-10 02:40,25-75,COAL CREEK NEAR CEDAR CITY, UT10234500: Flow=23.7cfs,Stage=0.55ft,2024-10-10 02:00,25-75,BEAVER RIVER NEAR BEAVER, UT10215900: Flow=8.06cfs,Stage=2.95ft,2024-10-10 02:00,25-75,MANTI CREEK BLW DUGWAY CREEK, NR MANTI, UT10205030: Flow=8.71cfs,Stage=2.62ft,2024-10-10 02:45,25-75,SALINA CREEK NEAR EMERY, UT10174500: Flow=58.4cfs,Stage=0.85ft,Floodstage=3.9ft,2024-10-10 02:15,25-75,SEVIER RIVER AT HATCH, UT10173450: Flow=18.0cfs,Stage=1.07ft,2024-10-10 02:45,25-75,MAMMOTH CREEK ABV WEST HATCH DITCH, NEAR HATCH, UT10172952: Flow=1.60cfs,Stage=2.27ft,2024-10-10 02:15,25-75,DUNN CREEK NEAR PARK VALLEY, UT10172800: Flow=3.82cfs,Stage=1.39ft,Floodstage=3.8ft,2024-10-10 02:15,25-75,SOUTH WILLOW CREEK NEAR GRANTSVILLE, UT10172700: Flow=1.74cfs,Stage=1.14ft,2024-10-10 02:30,25-75,VERNON CREEK NEAR VERNON, UT10172630: Flow=15.3cfs,Stage=8.55ft,2024-10-10 02:00,25-75,GOGGIN DRAIN NEAR MAGNA UTAH10172200: Flow=1.47cfs,Stage=0.39ft,2024-10-10 02:45,25-75,RED BUTTE CREEK AT FORT DOUGLAS, NEAR SLC, UT10170500: Flow=258cfs,Stage=10.01ft,2024-10-10 02:30,25-75,SURPLUS CANAL @ SALT LAKE CITY, UT10166430: Flow=0.64cfs,Stage=2.32ft,Floodstage=5.4ft,2024-10-10 02:45,25-75,WEST CANYON CREEK NEAR CEDAR FORT, UT10164500: Flow=17.2cfs,Stage=6.13ft,Floodstage=8.5ft,2024-10-10 02:15,25-75,AMERICAN FK AB UPPER POWERPLANT NR AMERICAN FK, UT10163000: Flow=99.4cfs,Stage=4.09ft,Floodstage=8.8ft,2024-10-10 01:45,25-75,PROVO RIVER AT PROVO, UT10156000: Flow=48.6cfs,Stage=2.38ft,2024-10-10 02:15,25-75,SNAKE CREEK NEAR CHARLESTON, UT10155500: Flow=210cfs,Stage=3.67ft,2024-10-10 02:30,25-75,PROVO RIVER NEAR CHARLESTON, UT10155000: Flow=56.4cfs,Stage=2.14ft,2024-10-10 02:00,25-75,PROVO RIVER NEAR HAILSTONE, UT10150500: Flow=82.9cfs,Stage=2.60ft,Floodstage=9ft,2024-10-10 02:15,25-75,SPANISH FORK AT CASTILLA, UT10146400: Flow=6.01cfs,Stage=4.14ft,2024-10-10 02:30,25-75,CURRANT CREEK NEAR MONA, UT10146000: Flow=7.27cfs,Stage=1.51ft,2024-10-10 02:30,25-75,SALT CREEK AT NEPHI, UT10142000: Flow=2.75cfs,Stage=0.37ft,2024-10-10 02:15,25-75,FARMINGTON CR ABV DIV NR FARMINGTON, UTAH10131000: Flow=18.7cfs,Stage=3.22ft,Floodstage=7ft,2024-10-10 02:30,25-75,CHALK CREEK AT COALVILLE, UT10129500: Flow=170cfs,Stage=2.21ft,2024-10-10 02:15,25-75,WEBER RIVER NEAR WANSHIP, UT10126000: Flow=617cfs,Stage=4.43ft,Floodstage=15.5ft,2024-10-10 02:30,25-75,BEAR RIVER NEAR CORINNE, UT10113500: Flow=88.1cfs,Stage=3.69ft,Floodstage=7.6ft,2024-10-10 01:45,25-75,BLACKSMITH FORK AB UP and L CO.\'S DAM NR HYRUM, UT10109000: Flow=118cfs,Stage=2.66ft,Floodstage=5.2ft,2024-10-10 02:00,25-75,LOGAN RIVER ABOVE STATE DAM, NEAR LOGAN, UT10105900: Flow=46.8cfs,Stage=4.89ft,Floodstage=9.7ft,2024-10-10 01:45,25-75,LITTLE BEAR RIVER AT PARADISE, UT10092700: Flow=565cfs,Stage=9.70ft,Floodstage=18.1ft,2024-10-10 01:45,25-75,BEAR RIVER AT IDAHO-UTAH STATE LINE10023000: Flow=12.0cfs,Stage=4.89ft,2024-10-10 01:45,25-75,BIG CREEK NEAR RANDOLPH, UT10020300: Flow=20.7cfs,Stage=2.49ft,Floodstage=8.2ft,2024-10-10 02:45,25-75,BEAR RIVER BELOW RESERVOIR, NEAR WOODRUFF, UT09413500: Flow=94.0cfs,Stage=7.98ft,2024-10-10 02:30,25-75,VIRGIN RIVER NEAR ST. GEORGE, UT09413200: Flow=73.5cfs,Stage=6.52ft,Floodstage=16ft,2024-10-10 01:45,25-75,VIRGIN RIVER NEAR BLOOMINGTON, UT09413000: Flow=4.64cfs,Stage=6.45ft,Floodstage=13.9ft,2024-10-10 02:00,25-75,SANTA CLARA RIVER AT ST. GEORGE, UT09410100: Flow=0.75cfs,Stage=16.07ft,2024-10-10 02:45,25-75,SANTA CLARA RIV BLW WINSOR DAM, NR SANTA CLARA, UT09408400: Flow=2.14cfs,Stage=1.18ft,2024-10-10 02:45,25-75,SANTA CLARA RIVER NEAR PINE VALLEY, UT09408150: Flow=76.5cfs,Stage=6.84ft,Floodstage=19.6ft,2024-10-10 02:15,25-75,VIRGIN RIVER NEAR HURRICANE, UT09408000: Flow=2.44cfs,Stage=2.52ft,2024-10-10 02:00,25-75,LEEDS CREEK NEAR LEEDS, UT09405500: Flow=37.6cfs,Stage=7.15ft,Floodstage=17ft,2024-10-10 02:50,25-75,NORTH FORK VIRGIN RIVER NEAR SPRINGDALE, UT09404900: Flow=44.9cfs,Stage=5.49ft,2024-10-10 02:50,25-75,EAST FORK VIRGIN RIVER NEAR SPRINGDALE, UT09378170: Flow=0.13cfs,Stage=0.24ft,2024-10-10 02:00,25-75,SOUTH CREEK ABOVE RESERVOIR NEAR MONTICELLO, UT09372000: Flow=32.3cfs,Stage=2.87ft,2024-10-10 02:30,25-75,MCELMO CREEK NEAR COLORADO-UTAH STATE LINE09337000: Flow=1.82cfs,Stage=1.92ft,2024-10-10 02:50,25-75,PINE CREEK NEAR ESCALANTE, UT09330500: Flow=13.5cfs,Stage=3.77ft,2024-10-10 02:30,25-75,MUDDY CREEK NEAR EMERY, UT09330000: Flow=76.2cfs,Stage=4.55ft,2024-10-10 01:45,25-75,FREMONT RIVER NEAR BICKNELL, UT09329050: Flow=6.88cfs,Stage=4.28ft,2024-10-10 01:45,25-75,SEVEN MILE CREEK NEAR FISH LAKE, UT09326500: Flow=12.5cfs,Stage=5.76ft,2024-10-10 02:15,25-75,FERRON CREEK (UPPER STATION) NEAR FERRON, UT09314500: Flow=31.5cfs,Stage=6.91ft,Floodstage=20ft,2024-10-10 02:30,25-75,PRICE RIVER AT WOODSIDE, UT09312600: Flow=3.79cfs,Stage=1.94ft,2024-10-10 02:15,25-75,WHITE R BL TABBYUNE CRK NR SOLDIER SUMMIT, UT09310500: Flow=8.10cfs,Stage=3.20ft,2024-10-10 02:15,25-75,FISH CREEK ABOVE RESERVOIR, NEAR SCOFIELD, UT09299500: Flow=57.4cfs,Stage=2.09ft,Floodstage=5.8ft,2024-10-10 02:30,25-75,WHITEROCKS RIVER NEAR WHITEROCKS, UT09295000: Flow=74.5cfs,Stage=3.08ft,Floodstage=8.4ft,2024-10-10 02:30,25-75,DUCHESNE RIVER AT MYTON, UT09291000: Flow=20.5cfs,Stage=1.16ft,2024-10-10 01:45,25-75,LAKE FORK RIVER BL MOON LAKE NR MOUNTAIN HOME, UT09288180: Flow=68.3cfs,Stage=5.50ft,2024-10-10 02:00,25-75,STRAWBERRY RIVER NEAR DUCHESNE, UT09288000: Flow=25.4cfs,Stage=1.39ft,2024-10-10 02:45,25-75,CURRANT CREEK NEAR FRUITLAND, UT09229500: Flow=13.8cfs,Stage=6.17ft,2024-10-10 02:15,25-75,HENRYS FORK NEAR MANILA, UT09183500: Flow=6.00cfs,Stage=3.38ft,2024-10-10 02:45,25-75,MILL CREEK AT SHELEY TUNNEL, NEAR MOAB, UT09180500: Flow=3270cfs,Stage=2.67ft,Floodstage=19ft,2024-10-10 02:45,25-75,COLORADO RIVER NEAR CISCO, UT09163500: Flow=3210cfs,Stage=3.58ft,Floodstage=15ft,2024-10-10 02:45,25-75,COLORADO RIVER NEAR COLORADO-UTAH STATE LINE410401112134801: Flow=328cfs,Stage=3.44ft,2024-10-10 02:45,Not ranked,GSL FARMINGTON BAY OUTFLOW AT CAUSEWAY BRIDGE403835112171801: Flow=2.28cfs,Stage=1.14ft,2024-10-10 02:30,Not ranked, (C- 2- 4)15cac-S1 MILL SPRING NR ERDA, UT10172727: Flow=0.00cfs,Stage=4.93ft,2024-10-10 02:45,Not ranked,FAUST CREEK NEAR VERNON, UT10168000: Flow=16.1cfs,2024-10-10 02:30,Stage=0.53ft,2024-10-10 02:45:00,Not ranked,LITTLE COTTONWOOD CREEK @ JORDAN RIVER NR SLC10155200: Flow=183cfs,Stage=0.94ft,2024-10-10 02:30,Not ranked,PROVO RIV AT RIV ROAD BRIDGE NR HEBER CITY, UT10153100: Flow=15.2cfs,Stage=3.86ft,2024-10-10 02:30,Not ranked,HOBBLE CREEK AT 1650 WEST AT SPRINGVILLE, UTAH10149400: Flow=33.3cfs,Stage=4.07ft,2024-10-10 02:15,Not ranked,DIAMOND FORK ABV RED HOLLOW NR THISTLE, UT10149000: Flow=23.1cfs,Stage=4.20ft,2024-10-10 02:15,Not ranked,SIXTH WATER CRK AB SYAR TUN NR SPRINGVILLE, UT10147100: Flow=9.92cfs,Stage=1.23ft,2024-10-10 02:30,Not ranked,SUMMIT CREEK ABV SUMMIT CR CANAL NR SANTAQUIN UT10140700: Flow=104cfs,Stage=6.05ft,2024-10-10 01:45,Not ranked,OGDEN RIVER NR GIBSON AVENUE AT OGDEN, UT10137000: Flow=59.5cfs,Stage=3.35ft,2024-10-10 02:45,Not ranked,WEBER RIVER AT OGDEN, UTAH10136600: Flow=77.1cfs,Stage=4.77ft,2024-10-10 02:25,Not ranked,WEBER RIVER AT I-84 AT UINTAH, UT10133980: Flow=18.4cfs,Stage=3.85ft,2024-10-10 02:00,Not ranked,EAST CANYON CREEK AB EAST CYN RES NR MORGAN, UTAH10133800: Flow=13.8cfs,Stage=4.49ft,Floodstage=8.1ft,2024-10-10 02:15,Not ranked,EAST CANYON CREEK NEAR JEREMY RANCH, UT10133650: Flow=9.60cfs,Stage=5.25ft,Floodstage=9.3ft,2024-10-10 02:30,Not ranked,E CANYON CR BL I-80 REST STOP NR PARK CITY, UT10133600: Flow=8.57cfs,Stage=6.26ft,Floodstage=8.9ft,2024-10-10 02:30,Not ranked,MCLEOD CREEK NEAR PARK CITY, UT10129900: Flow=1.44cfs,Stage=4.14ft,Floodstage=9ft,2024-10-10 02:30,Not ranked,SILVER CREEK NEAR SILVER CREEK JUNCTION, UT10129300: Flow=81.8cfs,Stage=2.73ft,2024-10-10 02:45,Not ranked,WEBER RIVER NEAR PEOA, UTAH10028500: Not ranked,Seasonal site,BEAR RIVER BELOW PIXLEY DAM, NEAR COKEVILLE, WY10016900: Flow=19.9cfs,Stage=0.50ft,Floodstage=7ft,2024-10-10 02:00,Not ranked,BEAR RIVER AT EVANSTON, WY10010100: Stage=4191.6ft,Floodstage=4204ft,2024-10-10 02:15,Not ranked,GREAT SALT LAKE NEAR SALINE, UT10010060: Stage=4.68ft,2024-10-08 14:15,Not ranked,BEAR R BAY OUTFLOW AT CAUSEWAY BRG NR WARREN, UT10010025: Flow=814cfs,Stage=4192.5ft,2024-10-10 02:45,Not ranked,GSL BREACH 6 MILES E OF LAKESIDE, UT; S TO N FLOW10010020: Flow=0.00cfs,Stage=5.03ft,2024-10-10 02:15,Not ranked,GSL BREACH AT LAKESIDE, UT10010000: Stage=4192.4ft,2024-10-10 01:45,Not ranked,GREAT SALT LAKE AT SALTAIR BOAT HARBOR, UT09413700: Stage=19.85ft,2024-10-10 01:20:00,Not ranked,Equipment malfunction,VIRGIN RV ABV THE NARROWS NR LITTLEFIELD, AZ09408195: Flow=0.00cfs,Stage=3.29ft,2024-10-10 02:15,Not ranked,FORT PEARCE WASH NEAR ST. GEORGE, UT09408135: Flow=71.3cfs,Stage=6.63ft,2024-10-10 02:15,Not ranked,VIRGIN RIVER AB QUAIL CREEK NEAR HURRICANE, UT09406100: Flow=39.9cfs,Stage=10.65ft,2024-10-10 02:10,Not ranked,VIRGIN RIVER AB LA VERKIN CREEK NR LA VERKIN, UT09381800: Flow=0.70cfs,Stage=6.89ft,2024-10-10 02:10,Not ranked,PARIA RIVER NEAR KANAB, UTAH09378630: Flow=0.00cfs,Stage=0.00ft,2024-10-10 02:30,Not ranked,RECAPTURE CREEK NEAR BLANDING, UT09332100: Stage=0.17ft,2024-10-10 02:30:00,Not ranked,Rating being developed or revised,MUDDY CREEK BL I-70 NR EMERY, UTAH09328990: Stage=3580.7ft,2024-10-10 01:45,Not ranked,COLORADO RIVER AB DIRTY DEVIL RIVER NR HITE, UT09328920: Flow=1720cfs,Stage=6.33ft,2024-10-10 02:15,Not ranked,GREEN RIVER AT MINERAL BOTTOM NR CYNLNDS NTL PARK09328910: Flow=1.41cfs,Stage=6.97ft,2024-10-10 02:15,Not ranked,SAN RAFAEL RIVER AT MOUTH NEAR GREEN RIVER, UT09319000: Flow=0.00cfs,Stage=-0.57ft,2024-10-10 01:45,Not ranked,EPHRAIM TUNNEL NEAR EPHRAIM, UT09309600: Stage=1.65ft,2024-10-10 02:15:00,Not ranked,Seasonal site,FAIRVIEW TUNNEL NEAR FAIRVIEW, UT09295100: Flow=56.9cfs,Stage=2.96ft,2024-10-10 02:45,Not ranked,DUCHESNE RIV ABV UINTA RIV, NR RANDLETT, UT09292000: Flow=38.5cfs,Stage=4.84ft,2024-10-10 02:15,Not ranked,YELLOWSTONE R @ BRIDGE CMPGRND NR ALTONAH, UT09285900: Flow=38.9cfs,Stage=1.93ft,2024-10-10 02:25,Not ranked,STRAWBERRY RIVER AT PINNACLES NEAR FRUITLAND, UT09272400: Flow=1290cfs,Stage=14.82ft,2024-10-10 02:00,Not ranked,GREEN RIVER AT OURAY, UTAH09271550: Stage=3.99ft,2024-10-10 01:45:00,Not ranked,Rating being developed or revised,ASHLEY CREEK BEL UNION CANAL DIV NR JENSEN, UT09185600: Flow=3100cfs,Stage=6.61ft,2024-10-10 01:45,Not ranked,COLORADO RIVER AT POTASH, UT09183600: Flow=2.90cfs,Stage=1.35ft,2024-10-10 02:50,Not ranked,MILL CREEK BELOW SHELEY TUNNEL, NEAR MOAB, UTGo to WaterWatch (offsite) for a larger map with additional options
Explanation
[color code for] High
[color code for] > 90th percentile
[color code for] 76th - 90th percentile
[color code for] 25th - 75th percentile
[color code for] 10th - 24th percentile
[color code for] < 10th percentile
[color code for] Low
[color code for] Not ranked
The colored dots on this map depict streamflow conditions as a percentile, which is computed from the period of record for the current day of the year. Only stations with at least 30 years of record are used.
The gray circles indicate other stations that were not ranked in percentiles either because they have fewer than 30 years of record or because they report parameters other than streamflow. Some stations, for example, measure stage only.

Statewide Streamflow Table


Current data typically are recorded at 15- to 60-minute intervals, stored onsite, and then transmitted to USGS offices every 1 to 4 hours, depending on the data relay technique used. Recording and transmission times may be more frequent during critical events. Data from current sites are relayed to USGS offices via satellite, telephone, and/or radio telemetry and are available for viewing within minutes of arrival.

All real-time data are provisional and subject to revision.

Build Current Conditions Table Show a custom current conditions summary table for one or more stations.
Build Time Series Show custom graphs or tables for a series of recent data for one or more stations.